Similar Projects
2022 Countywide Paving Project
Infrastructure
Bidding
CO

2022 Seal Project - Pavement Maintenance Program
Infrastructure
Bidding
Frederick, CO

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

2C Extension Asphalt Overlay
Post-Bid
Colorado Springs, CO

San Juan National Forest, Forest Service Lone Dome Road (NFSR 504) Resurfacing.
Results
$1,000,000 to $5,000,000 est. value
Dolores, CO 813013647

Road Overlays Program
Results
$150,000 to $200,000 est. value
Fruita, CO 81521

Mead Public Works Maintenance Facility
New Construction - 12,000 SF
Construction
Mead, CO 80542

Outdoor Vehicle Storage
New Construction
Pending Verification
Fort Collins, CO 80524

2022 Road Improvements
Infrastructure
Bidding
Edwards, CO

Fenno Wellhouse Replacement
Post-Bid
Vail, CO 81657

23rd Avenue Road Construction
Results
Evans, CO 80620

700 Wood Street Entrance Improvements
Infrastructure
Bidding
Fort Collins, CO 80521

2021 Asphalt Paver for the Road and Bridge Department
Post-Bid
Craig, CO

Brighton Road from East 104th Avenue to East 112th Avenue
Results
Commerce City, CO 80022

Overlaying the Asphalt Roadway, Structures and Various Accesses, Guardrail Replacement, Sign Replacement, and Roadway Patching
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value

Last Updated 02/23/2022 10:23 AM
Project Title

2022 Crack Sealing Program

Physical Address View project details and contacts
City, State (County) Dumont, CO 80436   (Clear Creek County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Asphalt pavement crack sealing services on various County roads and recreation paths which includes approximately 32,500 pounds of crack sealing at various locations throughout the County. Locations of the work to be done are summarized below: 1. Recreation Path (approx. 8 ft wide) a. Bakerville to Loveland Ski Area – 4 miles 2. County Roads (approx. 18 to 24 ft wide) – Approx. 43.3 miles a. Guanella Pass Road – 13.1 miles (Georgetown city limit to county line) b. Alvarado Road – 3.86 miles (County Rd. 308 to Georgetown city limit) c. Mill Creek Road – 2.52 miles (County Rd. 308 to end of pavement) d. Fall River Road – 1 mile (mile marker 4 to mile marker 5) e. Meadow View Drive – 0.6 miles (Hyland Dr. to end of pavement) f. Hyland Drive – 0.2 miles (Saddleback Dr. to Ponderosa Dr.) g. Ponderosa Drive – 1.0 miles (Hyland Dr. to Hy-Vu Dr.) h. Saddleback Drive – 0.9 miles (Elk Valley Dr. to Saddle Ridge Dr.) i. Squaw Pass Road – 7.0 miles (County line to Squaw Mountain Tr.) j. Sinton Road – 1.4 miles (Squaw Pass Rd. to Lodgepole Dr.) k. Witter Gulch Road – 4.66 miles (Upper Bear Creek Rd. to Squaw Pass Rd.) l. Circle K Ranch Road – 0.4 miles (Witter Gulch Rd. to King Murphy Elementary School) m. Stagecoach Blvd. – 1.5 miles (County line to Witter Gulch Rd.) n. Greystone Road – 0.9 miles (Stagecoach Blvd. to Witter Gulch Rd.) o. Upper Bear Creek Road – 1.6 miles (Witter Gulch Rd. to Yankee Creek Rd.) p. Golden Willow Road – 0.4 miles (Upper Bear Creek Rd. to Park Dr.) q. Yankee Creek Road – 1.4 miles (Upper Bear Creek Rd. to Willow Creek Rd.)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents