Similar Projects
North Main Street Duplexes
New Construction, Demolition - 707,287 SF
Conception
$10,000,000 CJ est. value
Fall River, MA

Rodman Street Townhomes
New Construction - 21,252 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Fall River, MA

Lawton Avenue Units
New Construction - 13,150 SF
Design
Taunton, MA 02780

Bay Street Convenience Store Additions
Renovation - 1,255 SF
Design
Taunton, MA

Elevator Upgrades to Two Traction Elevators
Bidding
$676,000 est. value
New Bedford, MA 02740

Residences at River Edge
New Construction - 33,239 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Fall River, MA 02720

Phase 2 Exterior Building Envelope Repairs at Bates and Tower Apartments
Renovation
Post-Bid
Less than $285,000 est. value
Fall River, MA 02724

Kitchen Modernization Maple Terrace Apartments
Results
$174,000 est. value
Attleboro, MA

Apartment Conversions at Cardinal Medeiros Towers, Project Ma 6-8
Results
Less than $270,000 est. value
Fall River, MA

The Lowney Chocolate Factory - Apartments and Retail
Renovation - 130,000 SF
Construction
$39,000,000 est. value
Mansfield, MA 02048

Willis Street Apartments
New Construction - 18,412 SF
Construction
$4,500,000 est. value
New Bedford, MA 02740

Brayton Avenue Triplex
Renovation, Addition
Conception
Fall River, MA

Former Reed and Barton Complex Redevelopment
Renovation - 316,322 SF
Design
Taunton, MA

Installation of Second Elevator and Heating System Upgrades - General Bids
Renovation
Results
Less than $3,700,000 est. value
Attleboro, MA 02706

Mechanics Mill Apartments
Renovation - 137,800 SF
Construction
$36,000,000 est. value
Attleboro, MA 02703

Last Updated 06/05/2019 07:55 AM
Project Title

Installation of Second Elevator and Heating System Upgrades - Filed Sub-Bids

Physical Address View project details and contacts
City, State (County) Attleboro, MA 02706   (Bristol County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,700,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. Installation of a new 5-stop elevator within the existing building and replacement of the existing 5-stop elevator (2 elevators). The scope will include limited demolition, reconstruction of the elevator penthouse, reconfiguration of the community room kitchen and restrooms, installation of new fire suppression system and generator, and installation of new HVAC system and geothermal system. The work will be phased to ensure that at least one elevator is operational at all times.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents