Similar Projects
MLK & Coralie Single Family Homes
New Construction
Design
North Las Vegas, NV 89032

Nellis Meadows: Park Improvements Irrigation Renovation and North Parking Lot Rehabilitation
Results
$4,966,543 to $5,227,941 est. value
Las Vegas, NV

Replace Playground Equipment and Safety Surface Systems
Renovation
Results
Las Vegas, NV 89121

Resurfacing of Cheyenne Sports Walking Track
Results
North Las Vegas, NV

2021 Safety Surface Maintenance
Renovation
Results
Less than $523,000 est. value
Henderson, NV

Kellogg Park Phase V: Dog Park
New Construction
Results
Pahrump, NV

Lincoln County Fairgrounds Recreation Park Phase III
Renovation
Post-Bid
Panaca, Pioche, NV 89042

Marina Park Playground Improvements
Renovation
Results
$736,550 est. value
Sparks, NV 89434

Design Build - Outdoor Bleacher
New Construction
Post-Bid
North Las Vegas, NV 89081

Playground Surface Repairs
Renovation
Post-Bid
Less than $225,000 est. value
Reno, NV

J.T. McWilliams Elementary School Field Replacement
New Construction
Bidding
$175,000 est. value
Las Vegas, NV 89108

Coral Academy of Science
New Construction - 105,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Henderson, NV

Last Updated 07/08/2021 09:02 AM
Project Title

Hollywood Regional Park: Site Improvements Hollywood Regional Park: SNPLMA Walking Trail

Physical Address View project details and contacts
City, State (County) NV   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $19,928,860 to $20,977,749
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope 1: $19,083,106.95 - $20,087,481.00. Scope 2: $845,754.60 - $890,268.00 Scope 1: Hollywood Regional Park: Site Improvements” and “Scope 2: Hollywood Regional Park: SNPLMA Walking Trail” are located at east of Hollywood Boulevard and north of Sahara Avenue, Las Vegas, Nevada. SCOPE 1: Site Improvements (RP.E0118017B): The work Includes the areas as indicated on the drawings & specifications and as consists of the following: Desert native gardens (~0.5 Acres); Open play turf (~5.6 Acres); four (4) -Run Dog park (~2 Acres); One (1) precast/fabricated Restroom building; Associated roadway and park entry area (sidewalk, roadway paving, markings, etc.); Monument signage and Directional signage. SCOPE 2: SNPLMA Walking Trail (RP.E0121052): The work covered under SNPLMA grant shall include Davis Bacon wages for all labor and includes the following: 1.26 miles of 10'-0" wide concrete trails; (3) 16'-0" X 16'-0" shade structures; (3) Picnic tables with integral benches each side; (4) Distance demarcations inscribed in the trail at quarter points along the trail; (8) Interpretive signs; (8) Mitigation signs; (4) Trash receptacles and (2) Pet station bag dispensers.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents