Similar Projects
Last Updated | 09/30/2022 07:38 AM |
Project Title | Equalization and Blend Tank Overflow Piping Replacement |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53202 (Milwaukee County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $332,827 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description: o The Contractor will: o On Tank 1, remove the existing 18-inch vertical piping, 18-inch x 12-inch cross, 18-inch x 12-inch wye; o On Tank 2, remove the existing 18-inch x 12-inch cross; furnish and install the specified Chlorinated Polyvinyl Chloride (CPVC) materials, consisting of 18-inch piping, an 18-inch cross, and connect the new piping to the existing piping for all flanged and welded connections, including the 3-inch odor control piping. Work covered by these Contract Documents in general covers the construction within the following facilities: Structure 257 - Equalization and Blend Facility A pre-bid presentation will be posted under contract J06075C28 REBID on Quest CDN and the District's Procurement Opportunities web page no later than 3:00 p.m. on August 24, 2022. The purpose of the presentation is to outline the contract scope and convey details about the bidding requirements and expectations. All potential bidders are encouraged to view the presentation at their convenience. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |