Similar Projects
New Raw Water Supply Line (Between Water Treatment Plant and Eastern Wellfield)
Infrastructure
Bidding
$3,000,000 est. value
Hollywood, FL 33024

Pines Village Water Main Improvements Phase II and Septic Tank Conversion
Infrastructure
Bidding
$13,778,000 est. value
Pembroke Pines, FL

Provide an On-Site Calibration and Verification of 26 Abb Flow Meters
Term Contract
Post-Bid
Less than $10,995 est. value
Hollywood, FL

Water System Interconnect Upgrades
Post-Bid
Pompano Beach, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

Bamford Park and University Drive Reclaimed Water Mains
Infrastructure
Bidding
$1,400,000 est. value
Davie, FL 33328

BCJC Jail Water Meter Reconfiguration
Post-Bid
Fort Lauderdale, FL 33301

12 Inch Water Main Installation Foster Road
Results
Less than $1,496,057 est. value
Hallandale, FL 33009

Utility Replacement along North 26th Avenue (Phase 1)
Infrastructure
Bidding
$3,436,000 est. value
Hollywood, FL 33020

Positive Displacement Cold Water Meters
Infrastructure
Post-Bid
Oakland Park, FL 33309

Raw Water Well #9 Pipeline
Results
Hallandale, FL 33009

Water Leak Detection And Monitoring System
Term Contract, Infrastructure
Bidding
Fort Lauderdale, FL

Repair and Calibration of Flow Meters and Related Services
Term Contract
Post-Bid
Coral Springs, FL

Design-Build Coral Shores Small Water Mains Improvements P12463
Results
$30,000 est. value
Fort Lauderdale, FL 33301

Last Updated 02/10/2022 11:03 AM
Project Title

Broward Boulevard Watermain Replacement (Phase I and II)

Physical Address View project details and contacts
City, State (County) Plantation, FL 33323   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $905,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of water mains within FDOT and city right-of-way. Work within FDOT right-of-way (Broward Boulevard) shall be considered Phase 1, the remainder of the project Phase 2. Due to excessive lead-times for material delivery, City shall pre-purchase pipe, fittings, joint restraints, gate valves, tapping sleeves, and service assemblies in advance and store in central location near project for Phase-1 (Contractor shall furnish and install materials for Phase 2). The Work set forth within these bid/proposal documents includes the furnishing of all labor, materials (with exception of those pre-purchased by City), equipment, services and incidentals for installing approximately 5,900 LF feet of 6-inch, 8-inch, 10-inch, and 12-inch water main and 450 LF of 14-inch subaqueous directional drilled, including connections to existing water mains, and grouting/abandoning existing water mains shown on the Drawings. Maintenance of existing operations is mandated throughout the construction period. Phase 1 of the Work is located in Broward County, in the City of Plantation. It encompasses Broward Boulevard from Holly Lane to East Acre Drive. Phase 2 is within Holly Lane and Cypress Road. The project is located in FDOT and City right of ways, City easements, City rights-of-way and on residential properties.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents