Similar Projects
Z2DZ--Replace HVAC B404 (C) 676-16-102
Design
$2,000,000 to $5,000,000 est. value
Tomah, WI 54660

Beyer Home Chimney Replacement
Bidding
Oconto, WI

Building B Air Tempering - Phase 1 - GPC
Bidding
Less than $2,200,000 est. value
Oshkosh, WI

Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI

Ionization System Installation
Post-Bid
Lancaster, WI 53813

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

Heating and Cooling Units Replacement
Results
Less than $210,000 est. value
Janesville, WI 53546

UW Platteville HVAC System Renovation And Skylight Replacement
Renovation
Bidding
Platteville, WI 53818

HVAC, Hot Water Heaters & Refrigerators
Term Contract
Post-Bid

Replacement of Furnaces
Results
$25,000 to $100,000 est. value
Fountain City, WI 54629

Wi Resource Center Building `B` Air Tempering
Renovation
Bidding
Oshkosh, WI

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

Kitchen Hood Replacement - MEP
Results
Less than $674,000 est. value
Menomonie, WI 54751

Air Handling Unit Replacement
Bidding
Less than $65,000 est. value
Kenosha, WI 53144

HVAC Hot Water Heaters and Refrigerators Installment
Term Contract
Post-Bid

Reported 02/05/2021 12:00 AM
Project Title

Pioneer, Valley View, and High School Air Conditioning

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54313   (Brown County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected February 2021, Construction Completion Expected August 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Pioneer Elementary School project generally consists of: 1. Demolition of three large air handling units, one single room air conditioning unit and associated roof-top condensing unit. 2. Installation of a new packaged air-cooled chiller, hydronic distribution, concrete slab, and fence. 3. Installation of four new air handling units and modifications to connect to the existing ductwork. Contractor is responsible to order units with adequate shipping splits to allow installation in existing locations 4. Installation of two new chilled water coils in two existing air handling units. 5. Installation of new grilles and insulating existing ductwork where indicated on the project drawings. 6. Removal of a portion of an existing wall for the installation of a new door. 7. Modifications to the existing electrical feeds and disconnects to the removed and new mechanical equipment. 8. Modifications of existing controls and installation of new direct digital control the Owner’s stipulated subcontractor for the controls work. The Valley View Elementary School project generally consists of: 1. Demolition of one large air handling units, two single room air conditioning units and associated roof-top condensing units. 2. Numerous classroom unit ventilators will be removed from service. Power disconnected, hot water supply and return removed, and outside air louvers sealed. 3. Installation of a new packaged air-cooled chiller, hydronic distribution, concrete slab, and fence. 4. Installation of two new air handling units and roof-top air distribution systems and one new air-handling unit replacement connecting to the existing ductwork. Contractor is responsible to order units with adequate shipping splits to allow installation in existing locations. 5. Installation of three new chilled water coils in three existing air handling units. 6. Installation of roof-top ductwork outside air hoods, relief ductwork, insulation, supports, curbs, and flashing. 7. Insulating existing ductwork where indicated on the project drawings. 8. Demolition of existing cabinets and installation of new studs, gypsum, paint, and wall base at new duct chases. 9. Installation of new ductwork, VAV’s, dampers, diffusers, and modifications to existing hot water piping in existing classrooms. 10. Installation of new frames to support the roof at new duct penetrations and lintels at wall penetrations 11. Modifications to the existing electrical feeds and disconnects to the removed and new mechanical equipment. The High School project generally consists of: 1. Demolition of seven air handling units, numerous single room air conditioning units and associated roof-top condensing units. 2. Numerous classroom unit ventilators will be removed from service. Power disconnected, hot water supply and return removed, and outside air louvers sealed. 3. Installation of three new roof-top packaged air-cooled chillers, unit screening, hydronic distribution, structural support frame, roof curbs, and flashing. 4. Installation of three new air handling units and roof-top air distribution systems and four new air-handling unit replacements connecting to the existing ductwork. Contractor is responsible to order units with adequate shipping splits to allow installation in existing locations. 5. Installation of six new chilled water coils in existing air handling units. 6. Installation of roof-top ductwork outside air hoods, relief ductwork, insulation, supports, curbs, and flashing. 7. Insulating existing ductwork where indicated on the project drawings. 8. Installation of new studs, gypsum, paint, and wall base at new duct chases. 9. Installation of new wall and door to create a new mechanical room in the existing teacher’s lounge. 10. Installation of new ductwork, VAV’s, dampers, diffusers, and modifications to existing hot water piping in existing classrooms 11. Installation of new frames to support the roof at new duct penetrations and lintels at wall penetrations. 12. Modifications to the existing electrical feeds and disconnects to the removed and new mechanical equipment. 13. Modifications of existing controls and installation of new direct digital controls DDC). Automated Logic is the Owner’s stipulated subcontractor for the controls work. Contractors will need coordinate their work with Automated Logic.

Details

Division 02 - Existing Conditions, Demolition, Selective Site Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Structural Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Masonry Anchorage and Reinforcing, Concrete Unit Masonry.
Division 05 - Metals, Structural Steel Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Flashing and Sheet Metal, Firestopping, Penetration Firestopping, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Hollow Metal Frames, Metal Doors, Hollow Metal Doors, Metal Windows, Door Hardware.
Division 09 - Finishes, Supports for Plaster and Gypsum Board, Non-Structural Metal Framing, Gypsum Board, Tiling, Acoustical Ceilings, Acoustical Tile Ceilings, Resilient Flooring, Resilient Base and Accessories, Resilient Tile Flooring, Painting, Interior Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 32 - Exterior Improvements, Fences and Gates, Chain Link Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents