Similar Projects
Site 45-M-SE-2 Middle School
New Construction
Conception
$46,700,000 est. value
Orlando, FL 32827

Lake Mary Elementary School Renovation
Renovation
Conception
$16,770,000 est. value
Lake Mary, FL 32746

Carrollwood Day School Center for Innovation
New Construction - 42,605 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Tampa, FL 33613

James Marlowe Elementary School
New Construction, Renovation
Design
$5,000,000 est. value
New Port Richey, FL 34652

Construction Management at Risk Services for Dommerich Elementary School and Maitland Middle School Multi-System Capital Renewal Project
Renovation
Bidding
$6,619,000 est. value
Maitland, FL 32751

Citrus Springs Elementary Kitchen Remodel
Renovation
Bidding
Citrus Springs, FL 34433

Rutledge Pearson Elementary School
New Construction
Sub-Bidding
Jacksonville, FL 32208

Lake George Elementary School
Renovation
Sub-Bidding
Orlando, FL 32812

Pinar Elementary School Comprehensive/Replacement Project Stormwater Revisions
New Construction, Renovation - 85,201 SF
Post-Bid
Less than $12,700,000 est. value
Orlando, FL 32800

North Grade Elementary School
Post-Bid
Lake Worth, FL 33460

Lauderdale Manors Elementary School - Smart Program Renovations
Renovation
Results
Less than $5,400,000 est. value
Fort Lauderdale, FL 33311

Prototype Classroom Building Additions and Miscellaneous Maintenance Repair
Results
Less than $35,505,000 est. value
Largo, FL 33779

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Witt Elementary School Renovation and Addition
Renovation, Addition
Construction
$17,000,000 est. value
Bradenton, FL 34212

Old Hyatt Hotel Conversion
Renovation - 150,000 SF
Pending Verification
Kissimmee, FL

Last Updated 01/27/2022 12:47 AM
Project Title

Lecanto Primary School Storefront Classroom Separations (Rooms 109, 110, 111 and 112)

Physical Address View project details and contacts
City, State (County) Lecanto, FL 34461   (Citrus County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Two (2) Store Front Style Interior Room Separations At Lecanto Primary Rooms 109 & 110. Reference Exhibit a And b. Two (2) Three-Bay Partitions Appox. 123" x 107 1/2", Each Having One 3'0" x 7'0" Door To Centered With Two Equal Sidelites. Sidelites Are To Have One Intermediate Horizontal Division At "Chair Rail" Height. Install a 2” x 5” x 1/8 Anodized Square Tube Under Drop Ceiling And Ancor At Each End. Framing Is To Be Anodized 1-3/4" x 4-1/2" Center-Set Flush Glaze For 1/4"Monolithic Infill. Doors Are To Be Anodized With Transom And Store Front Material In Finished Opening. Door Will Have 10” Bottom Rail With Adam Rite Lock And Push / Pull Bars. Install Two Back To Back Horizontal Safety Guards On Each Door. All Glass Is To Be 1/4" Clear Tempered. Field Verify All Measurments And Door Swing Prior To Manufractoring And Installation. Pe Sealed Drawings And Product Approval Number To Be Included. Two (2) Store Front Style Interior Room Separations At Lecanto Primary Rooms 111 & 112. Reference Exhibit c And d. Two (2) Three-Bay Partitions Appox. 123 1/4" x 107 1/2", Each Having One 3'0" x 7'0" Door To Centered With Two Equal Sidelites. Sidelites Are To Have One Intermediate Horizontal Division At "Chair Rail" Height. Install a 2” x 5” x 1/8 Anodized Square Tube Under Drop Ceiling And Ancor At Each End. Framing Is To Be Anodized 1-3/4" x 4-1/2" Center-Set Flush Glaze For 1/4"Monolithic Infill. Doors Are To Be Anodized With Transom And Store Front Material In Finished Opening. Door Will Have 10” Bottom Rail With Adam Rite Lock And Push / Pull Bars. Install Two Back To Back Horizontal Safety Guards On Each Door. All Glass Is To Be 1/4" Clear Tempered. Field Verify All Measurments And Door Swing Prior To Manufractoring And Installation. Pe Sealed Drawings And Product Approval Number To Be Included.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents