Similar Projects
Construction of the Pleasant Grove City - Cemetery Expansion Project
Bidding
Pleasant Grove, UT

Cottonwood Improvement District - Rehab 2021 Sewer Pipeline
Bidding
Sandy, UT

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

Storm Drain Improvements in Canyon Near Lacey Way
Results
$500,000 to $600,000 est. value
North Salt Lake, UT

2019 Public Works Project
Results
Hyrum, UT 84319

Installation of A Storm Drain Line Extension On 200 East
Construction
Enterprise, UT 84725

2021 Provo City Franklin Park Storm Drain - Phase 1 Project
Bidding
Provo, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Williams Building - Storm Water Conservation Garden
Results
$868,336 est. value
Salt Lake City, UT 84108

Construction of the Cedar Heights Stormwater Improvements
Post-Bid
Kanab, UT 84741

Utah Caldwell Wash Storm Drain Improvements
Results
Washington, UT 84780

2550 South Phase 3 Improvement Project
Post-Bid
West Haven, UT 84401

Hillside Lane Storm Drain
Results
$150,000 to $200,000 est. value
Salt Lake City, UT 84106

Scottish Drive Storm Drain and Waterway Project
Post-Bid
Cottonwood Heights, UT 84093

Reported 04/02/2020 12:00 AM
Project Title

Storm Drain Along Uprr Union Avenue to Main Street

Physical Address View project details and contacts
City, State (County) North Salt Lake, UT 84054   (Davis County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/27/20
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the grubbing and removal of approximately 1,250 SY of vegetation, the installation of 602 linear feet of 24” RCP, the installation of 3 storm drain manholes and the import of approximately 1,200 CY yards of granular backfill.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents