Similar Projects
Orchard Street Water Storage Tank Rehabilitation
Bidding
Less than $1,200,000 est. value
Raynham, MA 02767

Norumbega Covered Storage Tank Cell No. 2 Cleaning
Infrastructure
Bidding
Weston, MA

Water Tanks Maintenance and Asset Management
Term Contract
Post-Bid
Canton, MA

Seekonk High School Domestic Hot Water Tank
Infrastructure
Post-Bid
$80,000 est. value
Seekonk, MA 02771

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Champion City Recovery - Rail Tarping Station Replacement
New Construction
Pending Verification
Brockton, MA 02301

Rehabilitation of North Water Tank
Infrastructure
Bidding
$400,000 est. value
Leicester, MA

New Biofilter for EQ/Sludge Tank
Infrastructure
Post-Bid
Wareham, MA 02571

OWS Tank Cleaning Services
Results
Westfield, MA 01085

Forest Street Tank Rehabilitation
Infrastructure
Bidding
$700,000 est. value
Methuen, MA 01844

Water Storage Facility - Smith Neck Road Elevated Tank
Infrastructure
Post-Bid
$1,500,000 est. value
Dartmouth, MA

Waban Hill Reservoir Improvements
Results
Less than $900,000 est. value
Newton, MA

Millbury High School Domestic Hot Water Tank Replacement
Infrastructure
Bidding
$120,000 est. value
Millbury, MA 01527

Water Filter Plant Bulk Tank Installation
Infrastructure
Post-Bid
$15,000 est. value
Southbridge, MA

Last Updated 06/01/2022 08:56 AM
Project Title

Orchard Street Water Storage Tank Rehabilitation Re-Bid

Physical Address View project details and contacts
City, State (County) Raynham, MA 02767   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of restoration of the interior and exterior coating systems of a 683,000-gallon water storage tank, installation of a new OSHA compliant manway, new 24" pressure/vacuum roof vent, overflow pipe improvements, improvements to the existing valve vault, and safety improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents