Similar Projects
Opus Green
New Construction - 2,200 SF
Design
Millcreek, UT 84107

Storm Mountain Tennis Court
New Construction
Bidding
Sandy, UT

Elementary Playground Pit Upgrades
Infrastructure
Bidding
Riverton, South Jordan, UT 84095

Sunnyvale Park Improvements
Post-Bid
$300,000 to $400,000 est. value
Millcreek, UT

Pickleball Court Construction Project
Post-Bid
Sandy, UT 84070

State Street Pedestrian Bridge Removal
Results
Murray, UT 84107

Herriman High Track Resurface
Results
$400,000 to $500,000 est. value
Herriman, UT 84096

Bout Time Pub and Grub
New Construction, Renovation
Pending Verification
Sandy, UT 84070

Columbus Park Playground
Post-Bid
Salt Lake City, UT 84115

Heritage Park Splash Pad - Construction Management / General Contractor Services
Results
South Jordan, UT 84095

Old Farm Park - Splash Pad Refurbish
Post-Bid
Less than $160,000 est. value
Riverton, UT 84065

Playground Pit Upgrade
Term Contract
Results
Less than $230,000 est. value
Herriman, Riverton, South Jordan, West Jordan, UT 84084

Playgrounds
Post-Bid
Less than $60,000 est. value
Riverton, UT

Basketball Court Resurfacing
Results
Riverton, UT

Swing Set - City Office Playground
Post-Bid
Riverton, UT 84065

Last Updated 11/18/2021 06:53 AM
Project Title

SLCo Parleys Trail 900 W to Jordan River Trail

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84129   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Parley's Trail is an 8-mile multi-use bicycle and pedestrian trail that will link the Bonneville Shoreline Trail to the Jordan River Trail. This project consists of completing the last gap of the Parley’s Trail from 900 West to the Jordan River Parkway Trail. The project includes: construct a 10 foot wide paved trail within UDOT & UTA right of way between the I-201 and UTA Trax line starting at 900 West and ending at the Jordan River Trail. Work covered by this construction contract includes excavation, embankment, grading, trail construction, roadway, signing and striping, curb and gutter, curb ramp, storm drain, sidewalk, utilities, erosion control, chain link fence, retaining walls, concrete structures, two steel bridges, highway concrete barrier, w-beam guardrail, and miscellaneous items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Retaining Walls, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents