Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Refurbish and Upgrade the Unit 2 Pump Station
Renovation
Bidding
$350,000 est. value
Apopka, FL 32704

Refurbish/Upgrade the Unit 2 Pump Station
Renovation
Bidding
$350,000 est. value
Apopka, FL 32704

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Long Avenue Water and Sewer Improvements
New Construction
Post-Bid
Less than $5,000,000 est. value
FL 32456

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Utility Analysis Zone 108
New Construction, Infrastructure
Bidding
$540,038 est. value
Pompano Beach, FL 33060

Construction of Lift Station 1 Relocation
New Construction
Post-Bid
Maitland, FL

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Rehab of LS 54 and LS 65
Renovation
Construction
Clearwater, FL 33759

Sanitary Pump Station Journey`s End Upgrade and New Force Main Project
Renovation
Bidding
Coral Gables, FL 33156

RIVERTOWN PARCEL 1 "Public Utilities" JEA Lift Station, Reclaimed Main and Sewer Improvements
New Construction
Post-Bid
Jacksonville, FL

Reported 01/06/2022 09:12 AM
Project Title

Cedar Bay District II Pump Stations and Flow Rerouting Project - Robena Road

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32218   (Duval County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Construction Commenced November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, material, equipment and incidentals required and complete all work required by these Specifications, JEA’s Water and Sewer Standards Manual, January 2020 or latest version and as shown on the Drawings to provide the upgrades and rehabilitation at the Harts Road Wastewater Lift Station site. The following scope of work for this contract shall include but is not necessarily limited to, the following, all in accordance with the Contract Documents: 1.) Mobilization/Demobilization, General Requirements, Bonds and Insurance, Permitting, Project Controls, Testing, Record Drawings and As-Builts. 2.) Site Work a. Erosion and sedimentation control b. Clearing and Grubbing c. Site restoration including grassing, and other restoration d. Pavement mill and overlay as indicated on the Drawings e. Sidewalk installation and repair and replacement f. Landscaping and Irrigation 3.) Modifications and improvements to the existing wastewater pump station at Harts Road as specified herein, including but not limited to: a. Replacement of existing pumps with 90-horsepower dry-pit submersible horizontal Flygt pumps and associated piping, and valving appurtenances b. New detached elevated climate controlled precast electrical building with stair access and replacement of the below electrical components including but not limited to: 1) Motor controls centers (MCC), transfer switch, programmable logic controllers (PLC), human machine interface (HMI), controls, and communication equipment in kind c. Demolition of seal water system, and modifications to flushing water d. New 6-inch 316 stainless steel piping and flexible hosing for vac truck provisions e. Replacement of existing interior and exterior lighting with new LED fixtures f. Replacement of existing HVAC system capable of a minimum 12 air changes per hour (ACH) g. New aluminum stair access for existing floor opening 4.) Operational and maintenance manuals for all new equipment 5.) Equipment and services for acceptance testing 6.) Review of equipment installation 7.) Warranties and bonds 8.) All testing required during construction and startup 9.) All instrumentation and electrical components including but not limited to: conduit, wire, electric motors, control panels, variable frequency drives, motor control centers, and field instruments 10.) Permits listed below: a. FDEP and COJ Specific Permit to Construct the Pump Station Improvements. b. FDEP ERP Stormwater. c. SJRWMD Dewatering Permit if required, will be obtained by the Contractor. d. COJ 10-Set Review (Building / Zoning / Stormwater Management / Erosion Control Traffic / Landscape). e. National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges from a Construction Site Notice of Intent (NOI) – Contract documents will specify that the NPDES obtained by the Contractor. 11.) All other work in these contract documents not covered by the items listed above.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents