Similar Projects
Autoliv AOA Pump House Addition
Addition - 425 SF
Post-Bid
Ogden, UT 84401

2019 Payson City Spring Lake Pump House Modifications
Post-Bid
Payson, UT 84651

Otts Canyon Livestock Pipeline
Results
Vernon, UT

MP-12D - 700 South Pump Station
Results
Less than $17,200,000 est. value
Salt Lake City, UT

Laketown Water Improvements Project
Construction
Laketown, UT

Virgin River Pumphouse Renovation
Renovation
Post-Bid
$200,000 to $500,000 est. value
Saint George, UT

DFCM Construction - DOC USCF Off-Site Infrastructure Improvements
Results
Less than $70,000,000 est. value
Salt Lake City, UT

Elk Ridge Oak Lane Booster Pump Station
Post-Bid
Elk Ridge, UT 84651

Little Valley Pump Station Reconstruction
Results
Saint George, UT

Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

TM Boulevard Pump Station and Fox Canyon Pump Station
Results
Less than $1,000,000 est. value
Lehi, UT

Washington Dam Outfall and East Lift Station
Post-Bid
Washington, UT 84780

Jordan River Reservoir Pumping Facility
Results
Less than $425,500 est. value
Lehi, UT

2020 400 North Booster Station Project
Post-Bid
Less than $31,600 est. value
Bountiful, UT

Welby Jacob Canal Pump Station Project
Results
Less than $404,371 est. value
Bluffdale, UT

Last Updated 04/01/2019 11:32 AM
Project Title

DBB Replace POL Pump House Hill AFB Utah

Physical Address View project details and contacts
City, State (County) Ogden, UT 84056   (Weber County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Construct a 2,400 SF (40' x 60 ') liquid fuels distribution pump house to replace Bldg 870. Provide reinforced concrete footings, foundation, concrete slab floor, Concrete Masonry Unit (CMU) walls, standing seam metal roof, and personnel doors protected by gabled canopies. The height shall accommodate required vertical clearances for a bridge crane hoist to facilitate the replacement and maintenance of pumps and supporting fuel infrastructure. Facility must accommodate two existing 800 GPM pumps currently located in Bldg 870, and four new 600 GPM pumps. The four new pumps are required because a total of six pumps are necessary to keep the system on line. Requirements include an emergency eyewash station with an instantaneous electric water heater, a 12' x 12' coiling overhead metal door on one side to allow installation of pumps, a control room equipped with an emergency shut-off switch, and a unisex restroom. Provide intrusion detection, and fire detection and suppression. Provide two exterior 16" diameter fuel manifolds with miscellaneous piping and connections, and an adjacent underground Product Recovery Tank (PRT), preliminarily sized at 1,000 gallons. In the fuel yard, replace approximately 6,000 LF of corroded above ground 6" diameter piping with anti-corrosion coated heavy wall piping sized and engineered to maintain 800 gallon per minute (gpm) delivery volume. Provide new three pump covered fuel fill stand. Demolish existing fuel lines, manifolds, and valves this project replaces. Demolish Bldg 870. Provide all supporting facilities including: utility upgrades, site improvements, communication support, lightning protection, and an access drive and paved loading areas for a complete and usable system. Comply with current antiterrorism/ force protection standards.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents