Similar Projects
2022 Asphalt Milling Services
Infrastructure
Bidding
Littleton, CO

2022 Hot In Place Recycling
Infrastructure
Bidding
$300,000 est. value
Littleton, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

HPCH - Plum Creek Day Use Access Road Improvements
Results
Less than $250,000 est. value
Littleton, CO 80125

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

2021 Roadway Improvements Project
Infrastructure
Post-Bid
Bow Mar, CO

Resurfacing and Drainage, Signing, Striping, and Curb and Cutter
Results
$1,000,000 to $5,000,000 est. value
CO

Construction Debris, Solid Waste
Infrastructure
Post-Bid
Littleton, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Hot Mix Asphalt Fci Englewood
Term Contract
Post-Bid
Englewood, CO

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

Traffic Signal Replacement
Results
$1,000,000 to $5,000,000 est. value

Construction of the Filing 10, Filing 11, and Fultendale St. Roadways
Infrastructure
Post-Bid
Aurora, CO 80040

Last Updated 04/12/2022 03:15 PM
Project Title

Belleview (Sh-88) & Cherry Hills Farm Dr Traffic Island Removal & Roadway Const

Physical Address View project details and contacts
City, State (County) CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified firms for the furnishing of all labor, tools, materials, equipment, and incidentals necessary for the removal of a portion of a traffic island and reconstruction of the roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents