Similar Projects
Burnet Road Corridor - Koenig Lane Intersection to White Horse Trail
New Construction, Infrastructure
Bidding
$1,450,000 est. value
Austin, TX 78799

Bryson Phase 4 Section 5, Public Improvement Construction Plans
Infrastructure
Bidding
Leander, TX

Paving Drainage Water and Wastewater Improvements Phase 3
Post-Bid
Austin, TX 73301

Spanish Oaks Golf Club Site and NPS Plan
Post-Bid
Bee Cave, TX 78738

Southern Region Disaster Recovery Support BPA
Results

183A Phase III Project - Construction Engineering & Inspection Services
Results
Less than $180,000,000 est. value
Austin, TX 78705

Heatherwilde Phase III Pavement Rehabilitation Project
Infrastructure
Bidding
Pflugerville, TX

Water, Wastewater, Drainage and Paving Improvements for Bryson Phase 5 Section 1 and Bryson Phase 6, Public Improvement Construction Plans
Post-Bid
Leander, TX

2020 Asphalt Pavement Overlay Improvement Project
Results
Less than $526,370 est. value
Lakeway, TX 78734

2021 Street Maintenance Program - High Density Mineral Bond
Infrastructure
Post-Bid
Round Rock, TX

Preventive Maintenance
Results
Less than $1,546,004 est. value
TX

Bryson Phase 8, 9 and 12, Public Improvement Construction Plans Project
Infrastructure
Post-Bid
Leander, TX

CR 290 Road Work
Results
Less than $190,000 est. value
Leander, TX 78641

Vail Divide Extension and RM 3238 Widening
Infrastructure
Post-Bid
$8,000,000 est. value
Austin, TX

Berry Creek Highlands - Phase IB
Results
Austin, TX 78759

Last Updated 02/05/2022 08:14 AM
Project Title

FM 1626 - Hazard Elimination and Safety

Physical Address View project details and contacts
City, State (County) TX   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,221,259
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 39.000 1 104 6017 Removing Conc (Driveways) Sy 134.000 2 110 6001 Excavation (Roadway) Cy 2,424.000 3 132 6003 Embankment (Final)(Ord Comp)(Ty b) Cy 4,029.000 4 160 6003 Furnishing And Placing Topsoil (4") Sy 16,520.000 5 164 6035 Drill Seeding (Perm) (Rural) (Clay) Sy 16,520.000 6 164 6071 Broadcast Seed (Temp)(Warm Or Cool) Sy 16,520.000 7 168 6001 Vegetative Watering Mg 29.000 8 169 6002 Soil Retention Blankets (Cl 1) (Ty b) Sy 16,520.000 9 247 6366 Fl Bs (Cmp In Plc)(Ty a Gr 5)(Fnal Pos) Cy 1,598.000 10 310 6001 Prime Coat (Multi Option) Gal 1,591.000 11 347 6001 Tom (Asphalt) Pg 76-22 Ton 67.100 12 347 6002 Tom-c (Aggregate) Sac-a Ton 1,045.100 13 351 6004 Flexible Pavement Structure Repair(8") Sy 100.000 14 400 6006 Cut & Restoring Pav Sy 39.000 15 402 6001 Trench Excavation Protection Lf 60.000 16 403 6001 Temporary Spl Shoring Sf 7.000 17 432 6045 Riprap (Mow Strip)(4 In) Cy 85.000 18 460 6003 Cmp (Gal Stl 24 In) Lf 20.000 19 460 6010 Cmp Ar (Gal Stl Des 3) Lf 12.000 20 462 6007 Conc Box Culv (5 Ft x 3 Ft) Lf 120.000 21 464 6030 Rc Pipe (Arch)(Cl Iii)(Des 1) Lf 120.000 22 464 6032 Rc Pipe (Arch)(Cl Iii)(Des 3) Lf 807.000 23 466 6179 Wingwall (Pw - 1) (Hw=4 Ft) Ea 2.000 24 467 6380 Set (Ty Ii) (24 In) (Cmp) (6: 1) (p) Ea 3.000 25 467 6519 Set (Ty Ii) (Des 1) (Rcp) (6: 1) (p) Ea 2.000 26 467 6537 Set (Ty Ii) (Des 3) (Cmp) (6: 1) (p) Ea 3.000 27 467 6545 Set (Ty Ii) (Des 3) (Rcp) (6: 1) (p) Ea 24.000 28 480 6001 Clean Exist Culverts Ea 1.000 29 496 6004 Remov Str (Set) Ea 28.000 30 496 6007 Remov Str (Pipe) Lf 960.000 31 500 6001 Mobilization Ls 1.000 32 502 6001 Barricades, Signs And Traffic Handling Mo 7.000 33 506 6004 Rock Filter Dams (Install) (Ty 4) Lf 532.000 34 506 6011 Rock Filter Dams (Remove) Lf 532.000 35 506 6038 Temp Sedmt Cont Fence (Install) Lf 235.000 36 506 6039 Temp Sedmt Cont Fence (Remove) Lf 235.000 37 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 961.000 38 506 6045 Biodeg Erosn Cont Logs (Instl) (6") Lf 961.000 39 508 6001 Constructing Detours Sy 118.000 40 508 6003 Constructing Detours (Ty 1) Sy 1,932.000 41 530 6004 Driveways (Conc) Sy 282.000 42 530 6005 Driveways (Acp) Sy 243.000 43 540 6001 Mtl w-Beam Gd Fen (Tim Post) Lf 1,550.000 44 542 6001 Remove Metal Beam Guard Fence Lf 147.000 45 544 6001 Guardrail End Treatment (Install) Ea 5.000 46 544 6003 Guardrail End Treatment (Remove) Ea 1.000 47 560 6001 Mailbox Install-s (Twg-Post) Ty 1 Ea 2.000 48 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(t) Ea 5.000 49 644 6027 In Sm Rd Sn Sup&Am Tys80(1)Sa(p) Ea 3.000 50 644 6028 In Sm Rd Sn Sup&Am Tys80(1)Sa(p-Bm) Ea 2.000 51 644 6060 In Sm Rd Sn Sup&Am Tytwt(1)Ws(p) Ea 21.000 52 644 6076 Remove Sm Rd Sn Sup&Am Ea 32.000 53 658 6047 Instl Om Assm (Om-2y)(Wc)Gnd Ea 2.000 54 658 6061 Instl Del Assm (d-Sw)Sz 1(Brf)Gf2 Ea 21.000 55 662 6050 Wk Zn Pav Mrk Remov (Refl) Ty Ii-a-a Ea 1,472.000 56 662 6056 Wk Zn Pav Mrk Remov (Traf Btn) Ty w Ea 3,801.000 57 662 6058 Wk Zn Pav Mrk Remov (Traf Btn) Ty y Ea 5,152.000 58 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 100.000 59 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 110.000 60 666 6054 Refl Pav Mrk Ty i (w)(Arrow)(100mil) Ea 1.000 61 666 6078 Refl Pav Mrk Ty i (w)(Word)(100mil) Ea 1.000 62 666 6342 Ref Prof Pav Mrk Ty i(w)4"(Sld)(100mil) Lf 7,352.000 63 666 6344 Ref Prof Pav Mrk Ty i(y)4"(Brk)(100mil) Lf 1,702.000 64 666 6345 Ref Prof Pav Mrk Ty i(y)4"(Sld)(100mil) Lf 6,806.000 65 672 6007 Refl Pav Mrkr Ty i-c Ea 5.000 66 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 178.000 67 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 15,990.000 68 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 78.000 69 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 69.000 70 677 6008 Elim Ext Pav Mrk & Mrks (Arrow) Ea 1.000 71 677 6012 Elim Ext Pav Mrk & Mrks (Word) Ea 1.000 72 685 6004 Instl Rdsd Flsh Bcn Assm (Solar Pwrd) Ea 1.000 73 730 6107 Full - Width Mowing Cyc 2.000 74 734 6002 Litter Removal Cyc 2.000 75 738 6010 Cleaning / Sweeping (Spot) Mi 3.000 76 752 6003 Tree Trimming / Brush Removal Mi 0.736 77 3076 6003 d-Gr Hma Ty-b Pg64-22 (Exempt) Ton 3,007.900 78 3076 6038 d-Gr Hma Ty-d Pg64-22 (Level-Up) Ton 497.300 79 3076 6072 d-Gr Hma Ty-d Pg 76-22 (Exempt) Ton 783.800 80 3084 6001 Bonding Course Gal 782.000 81 3085 6001 Underseal Course Gal 3,835.000 82 6001 6001 Portable Changeable Message Sign Day 360.000 83 6185 6002 Tma (Stationary) Day 180.000 84 6185 6003 Tma (Mobile Operation) Hr 80.000 85 7251 6001 Subsurface Util Locate (Outside Rdbed) Ea 10.000 86

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents