Similar Projects
Last Updated | 09/09/2022 12:08 PM |
Project Title | Contract 3 Storage Lagoon and Rapid Infiltration Basin (RIB) Repair |
Physical Address | View project details and contacts |
City, State (County) | Hart, MI 49420 (Oceana County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,177,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of September 9 2022, project was awarded to Greenscape Services for $1,177,500. The project will start sometime in October 2022 and will be completed on December 2023. The project consists of furnishing all material and constructing the following: Repairing the berms and slopes of Storage Lagoon Nos. 2, 3, and 5, including slope protection. Construction of a duckweed screening system at the Storage Lagoon No. 2 and Storage Lagoon No. 3 outlet structures. Rehabilitation of the Rapid Infiltration Basins (RIBs), including addition of new underdrain piping, manholes, underdrain lateral terminations, and PVC liner repair. Including all necessary site work, appurtenances, and restoration. Contract documents may be examined electronically or at the offices of City of Hart, Hart City Hall, 407 State Street, Hart, MI 49420 Prein&Newhof, 4910 Stariha Drive, Muskegon, MI 49441 And some local plan rooms. Drawings and specifications are available electronically or at the Grand Rapids office of Prein&Newhof after Wednesday, July 6, 2022. Electronic drawings, specifications and bidding documents will be accessible/available only to those Bidders who are active members of the Prein&Newhof Plan Room. Bidder assumes sole risk for any project drawings and specifications, electronic or hard copy, obtained other than directly from Prein&Newhof. The Bidder is to complete the Bid Proposal documents that are included in the Project Specification book (online or hard copy), referring to the table of contents to identify the exact order of these documents. Regardless of how the bid documents are received, a hard copy (paper copy) of the Bid Proposal Documents must be submitted for bidding purposes. No electronically submitted Proposals will be accepted. The Bid Proposal Documents include: Bid Proposal Checklist, and Bid Proposal. The Bidder must provide the signed Bid Proposal Documents in either type written or hand written (in ink) form and clearly and completely set forth all required lump sum amounts, unit prices or other costs in a legible and understandable manner. Illegibility of any work or figure in the proposal may be sufficient cause for rejection of the proposal by the Owners. No electronically submitted Proposals will be accepted. Any conclusions or information obtained or derived from Contract Documents will be at the user's sole risk. Prein&Newhof will maintain in its Grand Rapids office the master copy (hard copy) of the Contract Documents from which all electronic copies are based. In the case of any contract discrepancy, the Master Copy (hard copy) shall be considered the controlling document. The work to be performed under this contract will be financed and paid for by funds received from by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) State Revolving Fund (SRF). SRF monies will be received by the City of Hart. DavisBacon/Prevailing Federal Wages apply to this project. Federal Labor Standards Provisions and associated documents that are incorporated in this contract are included in Appendix A. The SRF Project Number is 5722-01. The Contractor also will be required to comply with the debarment and American Iron and Steel contractual language included in Appendix A. For bid surety requirements, see Section 00 21 13 Instructions to Bidders. The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least one hundred twenty (120) days thereafter. Construction activities are to begin as soon as possible following contract award. Refer to Section 01 10 00 Summary of Work for additional limitations on construction operations. The project shall be completed in accordance with the following dates: Substantial and Final Completion - May 24, 2024. Refer to section 01 10 00 Summary of Work, subsection 1.06 Work Sequence and Coordination for project phasing information. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |