Similar Projects
Trailside at Everett Park Phase II
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
South Haven, MI 49090

South Final Tanks - TEMP22098 - City of Grand Rapids
Infrastructure
Conception
$500,000 est. value
Grand Rapids, MI 49503

Murphy Oil #7092/7845 / Lapeer
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Lapeer, MI 48446

Mill Creek Brewery Development / Dexter
New Construction, Infrastructure
Design
$1,725,000 CJ est. value
Dexter, MI 48130

Fenton-Thompson Road Water Main Extension
Infrastructure
Bidding
$6,000,000 CJ est. value
Fenton, MI 48430

Fenton-Thompson Road Water Main Extension
Infrastructure
Bidding
$6,000,000 CJ est. value
Fenton, MI 48430

Columbiaville Elementary Site Work
Post-Bid
Less than $86,000 est. value
Columbiaville, MI 48421

Biological Foul Air Mitigation Treatment System Subject Matter Expert and Process Equipment
Post-Bid
$8,156,000 est. value
Kalamazoo, MI 49007

Street And Utility Improvements Ruggles Street And Compton Street
Results
Bronson, MI

WWTP Clarifiers Rehabilitation, Contract 2, Construction and Installation
Results
Marshall, MI 49068

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

Action Mold and Machining Expansion
New Construction, Infrastructure - 15,400 SF
Construction
$4,400,000 CJ est. value
Wyoming, MI 49508

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Graphex Michigan I Processing Plant at Emerald Business Park
New Construction, Infrastructure - 150,000 SF
Pending Verification
$75,000,000 CJ est. value
Warren, MI 48089

Grandville - Franklin To Beacon - Water Improvement - Temp22085 - City Of Grand Rapids
Alteration
Conception
$1,500,000 est. value
Grand Rapids, MI 49504

Last Updated 09/09/2022 12:08 PM
Project Title

Contract 3 Storage Lagoon and Rapid Infiltration Basin (RIB) Repair

Physical Address View project details and contacts
City, State (County) Hart, MI 49420   (Oceana County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,177,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 9 2022, project was awarded to Greenscape Services for $1,177,500. The project will start sometime in October 2022 and will be completed on December 2023. The project consists of furnishing all material and constructing the following: Repairing the berms and slopes of Storage Lagoon Nos. 2, 3, and 5, including slope protection. Construction of a duckweed screening system at the Storage Lagoon No. 2 and Storage Lagoon No. 3 outlet structures. Rehabilitation of the Rapid Infiltration Basins (RIBs), including addition of new underdrain piping, manholes, underdrain lateral terminations, and PVC liner repair. Including all necessary site work, appurtenances, and restoration. Contract documents may be examined electronically or at the offices of City of Hart, Hart City Hall, 407 State Street, Hart, MI 49420 Prein&Newhof, 4910 Stariha Drive, Muskegon, MI 49441 And some local plan rooms. Drawings and specifications are available electronically or at the Grand Rapids office of Prein&Newhof after Wednesday, July 6, 2022. Electronic drawings, specifications and bidding documents will be accessible/available only to those Bidders who are active members of the Prein&Newhof Plan Room. Bidder assumes sole risk for any project drawings and specifications, electronic or hard copy, obtained other than directly from Prein&Newhof. The Bidder is to complete the Bid Proposal documents that are included in the Project Specification book (online or hard copy), referring to the table of contents to identify the exact order of these documents. Regardless of how the bid documents are received, a hard copy (paper copy) of the Bid Proposal Documents must be submitted for bidding purposes. No electronically submitted Proposals will be accepted. The Bid Proposal Documents include: Bid Proposal Checklist, and Bid Proposal. The Bidder must provide the signed Bid Proposal Documents in either type written or hand written (in ink) form and clearly and completely set forth all required lump sum amounts, unit prices or other costs in a legible and understandable manner. Illegibility of any work or figure in the proposal may be sufficient cause for rejection of the proposal by the Owners. No electronically submitted Proposals will be accepted. Any conclusions or information obtained or derived from Contract Documents will be at the user's sole risk. Prein&Newhof will maintain in its Grand Rapids office the master copy (hard copy) of the Contract Documents from which all electronic copies are based. In the case of any contract discrepancy, the Master Copy (hard copy) shall be considered the controlling document. The work to be performed under this contract will be financed and paid for by funds received from by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) State Revolving Fund (SRF). SRF monies will be received by the City of Hart. DavisBacon/Prevailing Federal Wages apply to this project. Federal Labor Standards Provisions and associated documents that are incorporated in this contract are included in Appendix A. The SRF Project Number is 5722-01. The Contractor also will be required to comply with the debarment and American Iron and Steel contractual language included in Appendix A. For bid surety requirements, see Section 00 21 13 Instructions to Bidders. The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least one hundred twenty (120) days thereafter. Construction activities are to begin as soon as possible following contract award. Refer to Section 01 10 00 Summary of Work for additional limitations on construction operations. The project shall be completed in accordance with the following dates: Substantial and Final Completion - May 24, 2024. Refer to section 01 10 00 Summary of Work, subsection 1.06 Work Sequence and Coordination for project phasing information.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents