Similar Projects
Grease Trap Pumping and Maintenance Services
Post-Bid
Atlanta, GA 30303

Storm Drain Lining
Infrastructure
Post-Bid
Fairburn, GA

Annual Contracts for Construction and Maintenance of Water Lines, Sanitary Sewers and Storm Sewers
Results
Less than $381,230 est. value
Hapeville, GA 30354

Septic Tank and Grease Trap Maintenance Services Countywide
Term Contract
Results
Atlanta, GA 30349

Sanitary Sewer Easement Maintenance
Term Contract
Post-Bid
Atlanta, GA 30328

Sanitary Sewer Flow Metering Phase 1
Results
Less than $495,540 est. value
Union City, GA 30291

Utilities Location Services
Infrastructure
Post-Bid
Atlanta, GA

Grovsner Terrace Pipe Replacement
Results
$23,448 est. value
Alpharetta, Johns Creek, GA 30005

Maxadaptor Sewer Repair Couplings
Term Contract
Post-Bid
GA

Stormwater Pipe Cleaning
Results
Less than $11,900 est. value
Johns Creek, GA

Standby Sewer Rehabilitation Services - Wastewater System
Results
GA

On-Demand Water and Sewer Services
Results
College Park, GA

Maxadaptor Sewer Repair Couplings
Infrastructure
Results
$12,709 est. value
GA

Oakhurst Leaf Drive Stormwater Pipe Lining
Infrastructure
Results
Milton, GA 30004

Connally Vault Sewer Capacity Relief Project
Infrastructure
Results
Atlanta, GA

Last Updated 11/05/2021 06:08 AM
Project Title

Atlanta-Newnan Road Pump Station and Force Main

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Fulton County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Design-Build Services (“D/B Services”) for the design and construction of Atlanta-Newnan Road Pump Station and Force Main This project will require all engineering, construction, quality control, etc., for the design, permitting, and construction of the new Atlanta-Newnan Road Pump Station and force main project. This project includes but is not limited to the final construction plans, specifications, permitting, and construction of a new South Chattahoochee Hills Pump Station, the construction of a forcemain from the Atlanta-Newnan Road Pump Station to the Little Bear Wastewater Reclamation Facility, the construction of a new Little Bear Pump Station, the construction of a force main from the Little Bear Pump Station to the Ono Road Pump Station, and theremoval of the Little Bear Wastewater Reclamation Facility. The Design-Build firm will provide all services necessary to complete the design, permitting, and construction of this project. The new Atlanta-Newnan Road Pump Station will be constructed justnorth of the intersection of Atlanta Newnan Road and Serenbe Lane on the east side of Atlanta Newnan Road on property being acquired by Fulton County. The force main will be installed within the right of right north along Atlanta Newnan Road to Rico Tatum Road, then east along Rico Tatum Road to Cochran Mill Road, the north along Cochran Mill Road to Wilkerson Mill Road, then east along Wilkerson Mill Road just east of Little Bear Creek. This force main will then join with another force main constructed at the site of the existing Little Bear Wastewater Treatment Facility. The existing facility will be replaced with a new pump station and the existing treatment facility decommissioned. A force main will be constructed from the new pump station to the force main from Atlanta-Newnan Road Pump Station along Wilkerson Mill Road. The combined force main will thence proceed east along Wilkerson Mill Road to Ono Road; thence north along Ono Road to just north of Bear Creek where the force main will flow into the OnoRoad Pump Station. A temporary force main will be designed to divert the flow from the Atlanta-Newnan Road Pump Station into the Little Bear Pump Station. Piping and valves shall be installed to allow the flow from Atlanta-Newnan Road Pump Stationto be diverted into either the Little Bear Pump Station or the Little Bear to Ono force main. The Little Bear Pump Station shall also be constructed to allow a new 24-inch gravity sewer line to enter the new pump station at an elevation a minimum of 3-feet below the high water level of Little Bear Pump Station

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents