Similar Projects
Non-Potable Water Tank Replacement to Serve Chelford City Regional Wastewater Treatment Facility
Renovation, Infrastructure
Bidding
$2,100,000 CJ est. value
Houston, TX 77083

Miscellaneous Plumbing Parts and Supplies
Infrastructure
Post-Bid
Houston, TX

Mechanical, Electrical and Plumbing MEP (JOC)
Alteration
Post-Bid
Houston, TX

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Plumbing Maintenance and Repair Services
Term Contract
Results
Pasadena, TX

Mechanical Electrical and Plumbing Service
Term Contract
Post-Bid
Houston, TX

District Wide Plumbing Parts and Supplies
Term Contract
Results
Humble, TX

2022 FRP MEP Project
Alteration
Post-Bid
$3,000,000 est. value
Spring, TX

District Wide Plumbing Services
Alteration
Results
Aldine, TX

Mechanical, Electrical, and Plumbing Service
Alteration
Post-Bid
Houston, TX

N19 Welding and Construction Renovations
Renovation
Results
$1,883,434 est. value
Houston, TX 77049

Plumbing Supplies and Materials
Term Contract
Post-Bid
Houston, TX

Outsourced Plumbing and Repair Service
Term Contract
Results
Deer Park, TX

Maintenance Supplies, Equipment and Services
Term Contract
Post-Bid
Waller, TX

2022 Multi - Campus MEP Renovations
Alteration
Results
$13,000,000 est. value
Humble, TX 77396

Last Updated 11/11/2022 12:33 PM
Project Title

Construction of the Water Reuse Distribution System Modifications to Serve Fort Bend County Levee Improvement District No. 7

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $724,420 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. (Texas Water Code 49.273) Bid security in the form of bid bond, certified or cashier's check payable to Fort Bend County Levee Improvement District No. 7 in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and bidder/contractor agrees that the Contract can be terminated if the bidder/contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Bidder/Contractor declares that it has not received from a governmental body a notice of noncompliance with a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such notice has been received, bidder/contractor has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same. 6" pvc reclaimed water pipe, awwa c-900, dr 18, all depths, includes all fittings(couplers, bends, etc.), 4" pvc reclaimed water pipe, awwa c-900, dr 18, all depths, includes all fittings (couplers, bends, etc.), 2" steel casing pipe with end caps, includes sealing case pipe on both ends with caps wet augering for 6" pvc water reuse pipe, all depths removal of existing plug and clamp and connection of proposed 6" pvc water reuse line to existing 6" water reuse line, includes all fittings (couplings, reducers, etc.), wet connection 8" x 6" tapping sleeve and valve, includes all fittings and appurtenances, 6" butterfly-type actuator valve, includes electric actuator, all fittings and appurtenances, concrete valve box as per detail sheet 31 4" reinforced concrete slope paving minimum, 3,000 psi, includes 2 foot toe wall on all sides, removal, disposal and replacement of existing fence and landscaping, as necessary to complete construction, removal, disposal and replacement of existing 4" reinforced concrete sidewalk, install, maintain, remove and dispose of stabilized construction exit, (to be used only at the direction of the engineer)

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents