Similar Projects
2022 Lighthouse Dr Reconstruction
Infrastructure
Design
$892,265 CJ est. value
Fond du Lac, WI 54935

River Point District - Phase II (Street & Utilities)
Infrastructure
Bidding
$9,300,000 CJ est. value
La Crosse, WI 54601

Underground Utilities Installation - GC
Infrastructure
Bidding
$1,500,000 CJ est. value
Madison, WI 53704

Chiller #1 Overhaul Heating & Cooling Plant
Renovation
Sub-Bidding
$110,000 CJ est. value
Kenosha, WI 53144

Appleton Public Library - BU 03B Concrete Topping
New Construction, Infrastructure
Sub-Bidding
$160,000 CJ est. value
Appleton, WI 54911

Concrete at Large 2021
Post-Bid
Marinette, WI

Redi-Mix Concrete
Post-Bid
Madison, WI

Concrete Maintenance and Replacement
Term Contract
Results
Appleton, WI

Oak Creek Skate Park
Results
Oak Creek, WI 53154

Entrance and Terrace Renovation University Center University of Wisconsin - River Falls - GPC
Renovation
Construction
$359,817 CJ est. value
River Falls, WI 54022

USDA Office Remodeling at Winnebago County Coughlin Center
Build-out
Bidding
$860,000 CJ est. value
Oshkosh, WI 54901

Appleton Public Library - BU 03A Building Concrete
New Construction, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Appleton, WI 54911

Castings
Term Contract
Post-Bid
Madison, WI

Poured-in-Place Resilient Surfacing
Results
Waukesha, WI

Auditorium Concrete Floor Polishing - Ronald Reagan High School
Alteration
Post-Bid
Milwaukee, WI 53221

Last Updated 08/29/2022 11:32 PM
Project Title

Install Storm Sewer Piping

Physical Address View project details and contacts
City, State (County) Fort McCoy, WI 54656   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $178,689 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website In general the work consists of: installation of a 10" HDPE storm sewer system that will collect roof drainage at the entrances to the building. Inlets will be installed at the roof gutter downspouts. Concrete sidewalk replacement and asphalt patching will be included as needed to allow for installation of the storm sewer system and to improve slopes for drainage. A new roof gutter and downspout will be installed on a roof line which currently does not have a gutter collection system. In addition, heat tracer wires will be replaced in this area. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents