Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

HVAC Maintenance-Greenville
Results
Greenville, SC

Courthouse Roof - Mechanical
Results
Greenville, SC 29607

Prisma Health Boiler Services
Post-Bid
Greenville, SC

Waste Water Treatment Services
Term Contract
Results
Greenville, SC 29601

HVAC Upgrades at Fort Mill High School, B, C, and E Wings
Post-Bid
Fort Mill, SC 29715

HVAC Preventive Maintenance
Results
Greenville, SC

HVAC Renovation Project at Berea Elementary School
Post-Bid
Greenville, SC 29617

HVAC System at Victor Gym
Results
Greer, SC

HVAC Renovation Project at Oakview Elementary School
Post-Bid
Simpsonville, SC 29681

HVAC Equipment and Installation
Results
Greenville, SC 29607

4 Exhaust Ventilation Systems for Mauldin Fire Department
Post-Bid
Greenville, Mauldin, SC 29662

Exhaust Hood Cleaning Services - District Wide
Results
Taylors, SC

HVAC and Electrical Services
Term Contract
Post-Bid

Last Updated 02/07/2019 08:43 AM
Project Title

Courthouse Cooling Towers

Physical Address View project details and contacts
City, State (County) Greenville, SC 29607   (Greenville County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Raise four (4) large HVAC cooling towers, units, frames and all associated piping, duct work, and electrical, up two (2) feet and set on permanent frame extensions. The units are located at The Greenville County Courthouse at 301 East North Street. Contractor will work with County Representatives and roofing consultant to coordinate time frames and installation. Contractor will test all four (4) HVAC Cooling Towers after rising to assure they are working as designed. Greenville County Property Management staff will inspect work performed during and after the installation is complete.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents