Similar Projects
ARPA Road Resurfacing Project
Infrastructure
Bidding
$500,000 est. value
Colorado Springs, CO

Woodmoor Mountain Road Projects
Infrastructure
Bidding
$300,000 est. value
Palmer Lake, CO 80133

Centennial Boulevard Extension Project
Post-Bid
Colorado Springs, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

CO FTBR Crystal Dam (1), East Portal Access Road
Results
$4,500,000 to $5,500,000 est. value
CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Street Improvements Uinta Road and a portion of Via Chula Vista
Infrastructure
Bidding
$600,000 est. value
Manitou Springs, CO

Pioneer Village Road Maintenance Services
Alteration
Post-Bid
Colorado Springs, CO

2021 Road Maintenance Project
Results
Monument, CO

30th Street - Fontanero Street to Mesa Road
Infrastructure
Post-Bid
Colorado Springs, CO 80907

Dublin and Peterson Intersection Improvements
Results
Colorado Springs, CO 80910

2C2 Pre-Overlay Concrete
Infrastructure
Post-Bid
Colorado Springs, CO

UTE Valley Regional Trail Construction
Results
$150,000 to $200,000 est. value
Colorado Springs, CO

I-25 Ramps South Nevada Avenue/South Tejon Street Corridor Improvements Project
Infrastructure
Post-Bid
$8,660,000 est. value
Colorado Springs, CO 80902

Asphalt Crack Seal
Term Contract
Results
Colorado Springs, CO

Last Updated 06/29/2022 06:31 AM
Project Title

Construction Main Street/Security Boulevard and Security/Widefield Boulevard and Fontaine Boulevard

Physical Address View project details and contacts
City, State (County) Peyton, CO 80831   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide all labor, materials, and equipment necessary for the Construction of the Main Street & Security Boulevard Intersection (Security Project) and the Security/Widefield & Fontaine Boulevard Intersection Improvement Projects (Fontaine Project), which includes but is not limited to: the removal of existing traffic signals and associated equipment, installation of traffic signals and associated conduit and equipment, construction of new ADA compliant pedestrian facilities, and signing/pavement markings, per the attached specifications and drawings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents