Similar Projects
Timber for Sale
Post-Bid
Pagosa Springs, CO

Huerto Creek IRTC
Post-Bid
CO

South Adams County Water and Sanitation District Bio-Solids Hauling and Composting Services
Results
Commerce City, CO

PKAA, Ben Butler Project
Results
Less than $84,865 est. value
Denver, CO

Waste & Refuse Collection and Management
Post-Bid
Golden, CO

Monarch Pass Forest Project; Cut to Length Steep Slope Logging
Results
Salida, CO 81201

Trash and Recycle Service
Post-Bid
Frisco, CO

Organics Recycling Services
Results
Loveland, CO 80537

Town Of Aguilar Waste Tire Cleanup Project
Post-Bid
$20,000 to $25,000 est. value
Aguilar, CO

On-Call Street Sweeping
Results
Longmont, CO

Disposal of Spoils City of Louisville Operations Division
Post-Bid
Louisville, CO 80027

Force Main and Siphon Condition Assessment and Cleaning
Results
Denver, CO 80229

Contracted Garbage Collection Service
Post-Bid
Holly, CO

Disposal of Spoils 2020
Results
Louisville, CO 80027

Solid Municipal Waste Hauling Services
Post-Bid
Denver, CO 80249

Reported 06/04/2021 12:00 AM
Project Title

Solid Waste and Recycling Services

Physical Address View project details and contacts
City, State (County) Johnstown, CO   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The goal of the RFP is to provide services that effectively collect and dispose of solid waste and recycling in a manner that is consistent with applicable State, Federal and local laws and regulations, while maximizing the fullest recovery of recyclable materials possible with the least impact on the environment and in a cost effective manner so as to enhance the safety and aesthetics of the Town. Objectives to achieving this goal include: 1. Encourage and facilitating the recovery, reuse and recycling of material within the waste stream. 2.Minimizing the rate of waste generation through education and source reduction.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents