Similar Projects
West Chapel Hill Water Storage Tank Rehabilitation
Bidding
Decatur, AL

Paint Services
Bidding
Columbiana, AL

Parking Deck 3 Concrete Painting
Post-Bid
Birmingham, AL 35203

Flooring Replacement and Painting
Post-Bid
Mobile, AL 36606

The Interior Coating of Hawkridge and Linden Street Tanks
Results
Trussville, AL 35173

Maintenance Bridge Painting
Results
$168,216 to $205,598 est. value
AL

Weatherly 100,000 Gallon Pedisphere Water Tank Painting
Post-Bid
Pelham, AL

Raintree Tank Refurbishment
Results
Huntsville, AL 35801

Repaint Room TA110 Storage
Post-Bid
Enterprise, AL

Campus Painting Services
Results
Huntsville, AL

Repainting of Interior Walls, Door Frames and Refinishing Two Corridor Doors
Post-Bid
Enterprise, AL

Unit Painting/Cleaning Services
Results
Auburn, AL 36832

Repainting of Two Fire Pump House Bladder
Post-Bid
Enterprise, AL

Maintenance Bridge Painting on SR-193 (North Bound Lane) Over the CSX Railroad
Results
$288,336 to $352,410 est. value
AL

Repainting of Interior Walls and Door Frames
Post-Bid
Enterprise, AL

Reported 11/17/2020 12:00 AM
Project Title

Repainting of Interior Walls, Ceilings, Floors, Doors & Door Frames, Baseball/Softball Complex Restrooms

Physical Address View project details and contacts
City, State (County) Enterprise, AL 36330   (Coffee County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Building(s): Baseball/Softball Complex Restrooms Room(s)/Area: Men’s & Women’s Restrooms Scope of Work & Preparation of All Areas to be Repainted: -All surfaces are to be treated with a 50/50 ratio bleach & water solution to remove any mildew. -All surfaces pressure washed to remove any remaining dirt grease or other contaminants. -Allow to dry completely. Scope of Work for Previously Painted Plywood Ceilings: -Apply one coat of Richards #26 Holzout Primer. -Apply two coats of Richards #1850 Thor Semi-Gloss Enamel. Color to be determined by owner (ESCC). -Follow all product manufacturer's directions, specifications and recommendations. -Thoroughly clean all work areas to include sweeping, mopping and wiping down all surfaces (walls, window sills, furnishing, etc.). Clean up should be performed each day prior to exiting the site. Scope of Work for Previously Painted Concrete Walls: -Apply two coats of Richards #1840 Thor Satin Enamel. Color to be determined by owner (ESCC). -Follow all product manufacturer's directions, specifications and recommendations. -Thoroughly clean all work areas to include sweeping, mopping and wiping down all surfaces (walls, window sills, furnishing, etc.). Clean up should be performed each day prior to exiting the site. Scope of Work for Previously Painted Concrete Floors: -Apply two coats Richards 4200 DeckGuard Floor Coating. Color to be determined by owner (ESCC). -Follow all product manufacturer's directions, specifications and recommendations. -Thoroughly clean all work areas to include sweeping, mopping and wiping down all surfaces (walls, window sills, furnishing, etc.). Clean up should be performed each day prior to exiting the site. Scope of Work for Previously Painted Metal Doors & Frames: -Sand with 220 grit sand paper to achieve a paintable surface and clean off all residue. -Prime all rust areas with Richards #1015 Rust Inhibitive Primer. -Apply two coats of Richards #1850 Thor Semi-Gloss Enamel. Color to be determined by owner (ESCC). -Follow all product manufacturer's directions, specifications and recommendations. -Thoroughly clean all work areas to include sweeping, mopping and wiping down all surfaces (walls, window sills, furnishing, etc.). Clean up should be performed each day prior to exiting the site. Scheduling and Time Allowances: -Work to be scheduled with the Plant Supervisor, Michael Helms (334-447-6477). -Once project has begun, the total job should be completed in no more than fourteen (14) consecutive calendar days. Products: -Any and all required materials and products to perform this job will be purchased and supplied by the successful bidder. -Material Safety Data Sheets (MSDS or SDS) of all products to be used should be supplied to the ESCC Plant Supervisor no less than seven (7) days prior to the work beginning.

Details

Division 09 - Finishes, Painting, Interior Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents