Similar Projects
The Flaming Gorge Project
Infrastructure
Design
$1,000,000,000 est. value
Greeley, CO 80631

Culvert Repair
Infrastructure
Bidding
$1,000,000 CJ est. value
Keenesburg, CO 80643

Job Order Contractor - Horizontal/Civil
Infrastructure
Bidding
Erie, CO

State Highway 60 Waterline Replacements
Post-Bid
Johnstown, CO

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

12 Inch Waterline Install and Bore Project
Results
CO

Zone 3 Waterline Extension Phase 2A
Results
Less than $2,299,505 est. value
Erie, CO

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Teague Recharge Facility Project
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Firestone, CO 80520

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Austin Avenue Water Main
Results
Erie, CO 80516

Colliers Hill Filing 4G Neighborhood Park
Infrastructure
Bidding
$75,000 CJ est. value
Erie, CO 80516

South Front Street Construction
Infrastructure
Post-Bid
Platteville, CO 80651

CO-Leadville NFH-Parking Lot Manhole Drain
Term Contract
Results
$25,000 to $100,000 est. value
Leadville, CO 80461

DOLA EIAF 9503 - Pierce WCR 90-Rowe Avenue Reconstruction
Infrastructure
Bidding
$2,000,000 CJ est. value
Pierce, CO 80650

Last Updated 07/28/2022 07:03 PM
Project Title

Project #1 Historic Firestone Waterline Replacement

Physical Address View project details and contacts
City, State (County) Firestone, CO 80520   (Weld County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Question Acceptance Deadline 07/08/2022 07:00 PM EDT Questions are submitted online No The Work for which the Bid is requested consists of: The base bid utility work is comprised of traditional "open cut" methodology to install roughly 1,700 LF of 8-inch C900 PVC DR18 waterline. Work includes connections to existing services, hydrant installation/replacement; installation of fittings, valves, and other pipeline appurtenances as more specifically defined herein. The base bid surface improvements are comprised of full depth asphalt removal and replacement, ribbon curb, concrete pan, grading modifications, and modifications to existing landscaping and plantings, as impacted by utility installations. Contractor shall furnish all materials, equipment, supplies, and appurtenances; provide all construction equipment and tools; and perform all necessary labor and supervision to complete the Work. Add alternates include additional 445LF of 8-inch C900 PVC DR18 waterline installation, surface restoration, and removal and disposal of existing asbestos cement pipe per CDPHE and OSHA regulations, for the segments shown on the contract drawings.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents