Similar Projects
2021 Road Improvements
Post-Bid
Indian Point, MO

Roadwork
Post-Bid
Kirksville, MO

Intersection Improvements
Results
Gladstone, MO 64119

Sunridge Park Asphalt and Sealing Project 2021
Results
Hillsboro, MO 63050

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

Highway 210 and Walker Road Intersection Improvements
Results
North Kansas City, MO

Sidewalk Removal and Replacement
Alteration
Post-Bid
Potosi, MO 63664

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Transportation Shop Concrete Project
Infrastructure
Post-Bid
Potosi, MO

2021 Mill and Overlay Program
Results
Gladstone, MO

Asphalt Overlay Portions of Perry County Roads
Alteration
Post-Bid
MO

2021 Intermediate Maintenance Program
Results
Gladstone, MO

2021 Asphalt Pavement Improvement
Infrastructure
Post-Bid
Jackson, MO

2021 Mill, Mat and Asphalt Overlay Program
Results
Festus, MO

Asphalt Repair and Sealing
Infrastructure
Post-Bid
MO

Reported 05/26/2022 12:00 AM
Project Title

FY 23 Street Preservation Project

Physical Address View project details and contacts
City, State (County) Belton, MO   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Belton is seeking proposals for an annual street preservation program that has renewal options for consecutive years if agreeable by both the City and the Contractor. The FY 2023 Street Preservation Program has an estimated 175,000 square yards of asphalt and shall require the Contractor to make subgrade repairs in areas where subgrade has failed. Requests for information related to this RFP should be directed to: Michael Kuhn, Engineer I Telephone: 816-892-1293 E-Mail: mkuhn@belton.org A late Proposal Packet is one received after 10:00 a.m., local time, at the time and place of the opening as stated. The decision as to the correct time for the openings shall be made by the Public Works Director of the City of Belton and that decision shall be final. Proposals received after the deadline date and time will be returned unopened. It shall be the responsibility of those submitting a proposal to assure themselves that their proposal has been received by the City of Belton.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents