Similar Projects
Road Maintenance and Repair
Design
Blacksburg, Covington, Edinburg, Harrisonburg, Marion, Natural Bridge Station, Wise, VA

Road Maintenance and Repair
Design
Blacksburg, Covington, Edinburg, Harrisonburg, Marion, Natural Bridge Station, Wise, VA

FY 2021-22 CDBG and Capital Street Resurfacing
Bidding
Covington, KY

Prestonia Grounds and Infrastructure Improvements
Bidding
Less than $1,880,691 est. value
Louisville, KY 40209

2019 Street Improvement Program - Ridgeway Avenue: From its intersection with Ohio Avenue it its Terminus
Post-Bid
Fort Thomas, KY

Road Maintenance
Post-Bid
Green Spring, KY 40027

Asphalt Milling/Paving/Restriping
Results
Burlington, KY

Boone County I-275 / Graves Road Interchange Design-Build
Results
KY

Beemon Lane Sidewalk/Conrad Lane Sidewalk/Idlewild Road Multi-Use Path
Bidding
Burlington, Florence, KY 41042

Bituminous Hot Mix Pavement Milling
Term Contract
Post-Bid
Owensboro, KY

2019 Street Program
Results
Less than $348,902 est. value
Fort Thomas, KY 41075

Paving
Bidding
Louisville, KY

Asphalt Paving and Milling
Post-Bid
Harlan, KY

Old Lexington Pike (CR1121) Resurfacing and Widening
Results
KY

Paving
Bidding
Prestonsburg, KY

Last Updated 03/20/2021 01:53 AM
Project Title

Asphalt Resurfacing

Physical Address View project details and contacts
City, State (County) KY   (Adair County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Adair County Cb06 001 0704 008-010 : Fairplay Rd (Ky 704) (Mp 8.500) From 0.202 Miles North Of Coomer Dr Extending North To Eddie Compton Rd (Mp 9.545), a Distance Of 1.05 Miles. Asphalt Resurfacing. Adair County Adair County Cb06 001 0767 000-001 : Pelham Branch Rd (Ky 767) (Mp 0.000) From Ky 439 Extending North To Ky 55 (Mp 0.729), a Distance Of 0.73 Miles. Asphalt Resurfacing. Adair County Cb06 001 0768 024-026 : Ky-768 (Ky 768) (Mp 24.600) From 0.526 Miles East Of Yellow Hammer Rd Extending East To Union Church Ln (Mp 25.660), a Distance Of 1.06 Miles. Asphalt Resurfacing. Adair County Cb06 001 1702 002-004 : Portland Rd (Ky 1702) (Mp 2.316) From The Trailing End Of b00050n Extending North To The Green County Line (Mp 3.570), a Distance Of 1.26 Miles. Asphalt Resurfacing. Adair County Cb06 001 2982 002-004 : Jones Chapel Rd (Ky 2982) (Mp 2.639) From b Neat Rd Extending East To Ky-61 (Mp 3.485), a Distance Of 0.85 Miles. Asphalt Resurfacing.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents