Similar Projects
Bridge Thin Deck Overlay - SR 66
Infrastructure
Bidding
$1,460,000 CJ est. value
Evansville, IN 47710

Bridge Thin Deck Overlay - SR 66
Infrastructure
Bidding
$1,460,000 CJ est. value
Evansville, IN 47710

Evansville Water and Sewer Utility SMD Street Maintenance Department Relocation
Demolition, New Construction, Infrastructure - 74,400 SF
Sub-Bidding
$500,000 CJ est. value
Evansville, IN 47708

2021 Community Crossings
Post-Bid
Evansville, IN

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Fendrich Neighborhood Watermain Replacement
Results
Less than $1,970,000 est. value
Evansville, IN 47711

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

2022 Annual Sewer Lining - Hitch and Peters Road
Infrastructure
Bidding
$1,159,274 CJ est. value
Evansville, IN 47708

Green River Road Trail Project
Infrastructure
Post-Bid
$40,000 est. value
Evansville, IN 47725

Milling and Resurfacing of County Roads
Results
Evansville, IN

Menards Drive Multi-Tenant Building
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Evansville, IN 47715

Evans and Louisiana Water Main Replacement
Infrastructure
Bidding
$567,500 CJ est. value
Evansville, IN 47711

Preventative Maintenance for and Fire Sprinkler and Standpipe System and Fire Hydrants
Infrastructure
Post-Bid
Evansville, IN 47714

Last Updated 09/21/2022 04:29 PM
Project Title

Green River Road Trail Phase II Lenape Lane to High Tower Drive

Physical Address View project details and contacts
City, State (County) Evansville, IN 47715   (Vanderburgh County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work for the Green River Road Trail Project, Phase 2 includes the construction of an HMA multi-use pathway between Lenape Lane and Hightower Drive. Project elements include approximately 5,000 LFT of 8 ft. wide multi-use pathway, the widening of four existing bridges, construction of a new entrance to Green River Road Canoe Launch, traffic signal installation, modular block wall, guardrail, storm sewer, fire hydrant relocation, signing and pavement markings. The proposed work will also require clearing, removal and replacement of existing soils, chemical soil stabilization, erosion and sediment control and mulched seeding. Green River Road will be open to a minimum of one travel lane in each direction during construction. An alternate bid item, which switches the paving material of the multi-use pathway from HMA to PCCP, will be requested. Additional information regarding work included in the Green River Road Trail Project, Phase 2 is contained within the Bidding Documents. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of Bidder's maximum Bid price (determined by adding the base bid and all alternate bids), which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within seven (7) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution. The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids and alternates as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least sixty (60) days. A conditional or qualified Bid will not be accepted. Award will be made to the low, responsive, responsible bidder. The low, responsive, responsible bidder must not be debarred, suspended, or otherwise be excluded from or ineligible for participation in federally assisted programs under Executive Order 12549. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the project throughout. Bids shall be properly and completely executed on bid forms included in the Specifications. Bids shall include all information requested by Indiana Form 96 (Revised 2013) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. A copy of the proposed Financial Statement to be submitted with the bid is included in the specifications. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. Each Bidder is responsible for inspecting the Project site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid. The cut-off for questions will be 5:00 p.m. CST on September 16. 2022. All questions shall be transmitted electronically to the Engineer atjshofstall@vsengineering.com

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents