Similar Projects
Hamblen County Schools 2021 Site Improvements at Two School Sites
Infrastructure
Bidding
Morristown, TN 37813

Provide Site Work for Projects
Infrastructure
Bidding
TN

Cemetery Expansion
Post-Bid
Dyersburg, TN

Columbia Academy Fence Repair
Renovation
Post-Bid
Columbia, TN 38401

Lupton City Mill Site Remediation
Results
Less than $1,465,400 est. value
Chattanooga, TN 37402

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

Bledsoe Fall Creek Falls Fiber Optic Expansion
Renovation
Construction
Pikeville, TN 37367

Substation Site Development
Infrastructure
Bidding
Bristol, TN

Demolition and Site Restoration of 312 Athens Pike
Demolition
Post-Bid
Etowah, TN 37331

Demolition of Aircraft Hangar
Demolition
Results
Knoxville, TN 37920

Major League Soccer Infrastructure Improvements
New Construction
Post-Bid
Nashville, TN 37204

Emergency Rockfall Mitigation on S.R. 70 near L.M. 16.20
Results
TN

Aaittafama Archaeological Park
Post-Bid
Nashville, TN

Hickory Valley Sitework and Infrastructure Improvements
Post-Bid
Cookeville, TN 38501

Andrew Johnson Elementary School Playground Site Work
Post-Bid
Kingsport, TN 37664

Reported 05/25/2021 12:00 AM
Project Title

Directional Boring Services

Physical Address View project details and contacts
City, State (County) Maryville, TN   (Blount County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Directional boring services of HDPE water, forced sewer, and electrical conduit facilities. The work will be within the City of Maryville’s service territory and will include both scheduled work as well as emergency boring services for unscheduled / unplanned work. The Contractor must have local facilities that provide a 2-hour or less response time for emergency call out work. The work will also require the selected Contractor to have the “In-house” ability to complete required bores in both unconsolidated (DIRT) and consolidated (ROCK) soil conditions. The City of Maryville will expect the selected Contractor to have the ability to directional bore and heat fuse HDPE facilities ranging in sizes from ½” CTS through 12” DIPS.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents