Similar Projects
West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Design
$9,600,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

AutoZone #2208 / Las Vegas
New Construction, Infrastructure - 26,170 SF
Bidding
$7,000,000 CJ est. value
Las Vegas, NV 89115

Hualapai Way-Russell Road to CC215, and Flamingo Road - Hualapai Way to Grand Canyon Drive
Infrastructure
Bidding
$7,098,173 CJ est. value
Summerlin South, NV 89135

Delta Academy - Exterior
Alteration
Post-Bid
$85,680 est. value
North Las Vegas, NV 89030

Centennial And Lamb Commercial Site Work
Alteration
Post-Bid
North Las Vegas, NV 89115

Pavement Maintenance and Site Improvements
Results
$225,000 est. value
Las Vegas, NV 89131

Jones Maintenance Yard Expansion -Jones Boulevard And Pyle Avenue
Results
$4,826,854 to $5,334,944 est. value
Las Vegas, NV 89141

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Matter Logistics at North 15
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
North Las Vegas, NV 89030

Tommy's Express Carwash / North Las Vegas
New Construction, Infrastructure - 4,550 SF
Pending Verification
$500,000 CJ est. value
North Las Vegas, NV 89084

Cactus, Las Vegas Boulevard to Bermuda - Clark County
Infrastructure
Conception
Las Vegas, NV 89183

Last Updated 08/22/2022 03:02 PM
Project Title

WRF Site Security Improvements - U0037 - City Of Henderson

Physical Address View project details and contacts
City, State (County) Henderson, NV 89015   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,820,825 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construct site security improvements including approximately 8,500 lf perimeter 8-ft block wall with top-mounted wrought iron prods at the Kurt R. Segler Water Reclamation Facility that will match the existing wall to the south of the USSB and surround the existing mechanical plant process and the area designated for future plant expansion. Video surveillance equipment including camera, fiber lines and other associated hardware at WRF, SWRF and WTP. This project is included in the city’s FY 2023-2028 Budget Capital Improvement Program. As of August 5, 2022, further details regarding design and construction timelines have not been identified. truction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents