Project Title | Resurfacing and Related Work (Including Bridge Deck and Joint Repairs) Along Sections of Route 146 (Worcester-Providence Turnpike) |
Physical Address | View project details and contacts |
City, State (County) | Douglas, Northbridge, Sutton, Uxbridge, MA 01516 (Worcester County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $9,162,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "1.000","Ls","Schedule Of Operations - Fixed Price $69000","100." "325.000","Cy","Unclassified Excavation","120.1" "40.000","Cy","Reinforced Concrete Excavation","127.1" "30.000","Sy","Reinforced Concrete Deck Excavation (Full Depth)","127.4" "25.000","Cy","Reinforced Concrete Deck Excavation (Partial Depth)","127.41" "100.000","Cy","Class a Trench Excavation","141." "90.000","Ea","Drainage Structure Adjusted","220." "20.000","Ft","Drainage Structure Rebuilt","220.2" "40.000","Ea","Frame And Cover - Secured","221.1" "50.000","Ea","Frame And Grate - Massdot Bar Type","222." "100.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "715.000","Cy","Removal Of Drainage Structure Sediment","227.3" "30000.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "100.000","Sy","Stone For Pipe Ends","258." "9800.000","Sy","Bridge Pavement Milling","415.4" "198000.000","Ft","Pavement Micromilling For Inlay","415.5" "296000.000","Sy","Ultra Thin Bonded Overlay-Polymer Modified","450.16" "820.000","Ton","Superpave Bridge Surface Course - 9.5 Polymer (Ssc-b - 9.5 - p)","450.601" "130.000","Ton","Hma For Patching","451." "1210.000","Gal","Asphalt Emulsion For Tack Coat","452." "8850.000","Ft","Hma Joint Sealant","453." "820.000","Ton","Superpave Waterproofing Surface Course (Ssc-w-9.5)","457.1" "200.000","Ton","Asphalt Mixtures For Temporary Work","472." "2400.000","Ft","Milled Rumble Strip","477." "4000.000","Gal","Hot Applied Asphaltic Crack Filler (Cmcr)","482.03" "270.000","Ft","Sawing & Sealing Joints In Asphalt Pavement At Bridges","482.31" "1240.000","Ea","Slotted Pavement Marker Removal","490.51" "15200.000","Gal","Fog Seal Polymer","492.103" "100.000","Ft","Granite Edging Type Sb - Straight","511.1" "1500.000","Ft","Edging Removed And Reset","583." "100.000","Ft","Edging Removed And Discarded","597." "60219.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "67.000","Ea","Trailing Anchorage","627.1" "1.000","Ea","Guardrail End Treatment, Tl-3 (Double Faced)","627.73" "64.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "9.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "1.000","Ea","Transition To Nchrp 350 Guardrail (Double Faced)","628.211" "5.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "48.000","Ea","Transition To Bridge Rail","628.24" "500.000","Ft","Highway Guard Removed And Reset","630." "68682.000","Ft","Highway Guard Removed And Discarded","630.2" "25.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "100.000","Cy","Loam Borrow","751." "1000.000","Sy","Seeding","765." "26600.000","Ft","Sediment Control Barrier","767.121" "69000.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "500.000","Ft","Wire Loop Installed In Roadway","819.831" "4.000","Ea","24 Inch Warning Cluster (h1-2) - Aluminum Panel (Type a)","827.21" "6.000","Ea","Abutment Warning Sign (h1-3) - Aluminum Panel (Type a)","827.33" "50.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "10.000","Ea","Delineation For Guard Rail Termini","833.7" "5.000","Ea","Demountable Reflectorized Reference Location Sign","834." "112.000","Ea","Reflectorized Flexible Delineator Post (Amber)","834.17" "112.000","Ea","Reflectorized Flexible Delineator Post (White)","834.18" "25.000","Ea","Demountable Reflectorized Station Marker","836.5" "10.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "308.000","Day","Traffic Cones For Traffic Management","851.1" "2600.000","Sf","Safety Signing For Traffic Management","852." "616.000","Day","Truck Mounted Attenuator","853.403" "308.000","Day","Temporary Illumination For Work Zone","853.8" "130000.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "10100.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "616.000","Day","Arrow Board","856." "840.000","Day","Portable Changeable Message Sign","856.12" "50038.000","Day","Reflectorized Drum","859." "308.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "126500.000","Ft","6 Inch Wet Reflective Recessed White Line (Polyurea)","868.206" "6000.000","Ft","12 Inch Wet Reflective Recessed White Line (Polyurea)","868.212" "5048.000","Ft","6 Inch Wet Reflective Recessed White Line (Preformed)","868.306" "99000.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "5.000","Ea","Traffic Sign Removed And Reset","874.2" "10.000","Ea","Traffic Sign Removed And Discarded","874.41" "1.000","Cy","5000 Psi, 3/8 Inch, 710 Hp Cement Concrete","905.2" "35.000","Cy","5000 Psi, 3/8 In. High - Early Strength Cement Concrete","905.21" "50.000","Cy","Rapid Setting Low Permeability Repair Concrete","909.3" "5000.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "15.000","Sf","Epoxy Bonding Compound","964.1" "100.000","Ft","Asphaltic Bridge Joint System - Modified","971.2" "250.000","Ft","Neoprene Compression Seal For Bridge Joint","972.61" "160.000","Ft","Neoprene Strip Seal For Bridge Joint","972.62" "500.000","Sf","Temporary Protective Shielding","994.1" "5000.000","Sf","Temporary Protective Shielding r & r","994.12" |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |