Similar Projects
Kendall Square Redevelopment Commercial Building D
New Construction, Infrastructure - 287,000 SF
Design
$67,000,000 CJ est. value
Cambridge, MA 02142

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Sidewalk Repairs for the City
Results
Somerville, MA

Resurfacing and Related Work on A Section of Route 28
Results
Less than $11,647,763 est. value
Cambridge, Somerset, MA

New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF)
Demolition, New Construction, Infrastructure - 160,000 SF
Construction
$276,858,491 CJ est. value
Hanscom AFB, MA 01731

New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF)
Demolition, New Construction, Infrastructure - 160,000 SF
Construction
$276,858,491 CJ est. value
Hanscom AFB, MA 01731

Central Square Mixed-Use Development
New Construction, Build-out, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Chelmsford, MA 01824

Project Echo
New Construction, Infrastructure - 800,400 SF
Pending Verification
$86,000,000 CJ est. value
Holliston, MA 01746

RFQ D/B - Hopkinton-Westborough - Interchange Improvements, Interstate 495 (NB and SB) at Interstate 90 (EB and WB)
Infrastructure
Post-Bid
$339,185,107 CJ est. value
Hopkinton, MA 01748

Parker Meadow ADA Improvements
Results
$630,125 est. value
Lexington, MA

Galen Street Life Sciences Buildings - Phase 1
LEED Certification, New Construction, Infrastructure - 242,000 SF
Construction
$65,000,000 CJ est. value
East Watertown, MA 02472

Chestnut Street Multi Residential
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Newton, MA 02464

18-20 Coyne Road Rehabilitation
Infrastructure
Post-Bid
$160,000 est. value
Newton, MA 02468

DPW Facility Salt Shed Locus Map Replacement Project
Demolition, New Construction, Infrastructure
Results
$1,543,950 CJ est. value
Melrose, MA 02176

Last Updated 01/05/2023 04:22 PM
Project Title

Middlesex Community College Bedford Quad Patio Project

Physical Address View project details and contacts
City, State (County) Bedford, MA 01730   (Middlesex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $275,725 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Agency Name and Address Middlesex Community College 591 Springs Road Bedford, MA 01730 Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Project consists generally of constructing a new concrete-paved patio, as well as related work, including but not limited to selected demolition and site preparation, surface and sub-surface storm drainage utility modifications, sub-base materials and other preparation work in advance of forming and placing the concrete patio, and restoration of existing adjacent landscaped and paved areas that are disturbed during the execution of the Work. Refer to Section 012300 ALTERNATES for Add Alternate scope description of permanent in-ground cast-in-place footings and tent tie-back anchors. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates), and made payable to the MIDDLESEX COMMUNITY COLLEGE BEDFORD. Note: A bid deposit is not required for Projects advertised under $50,000. The work is estimated to cost $241,287.00. Time of Completion: The Contractor shall commence work under this Contract on the date specified in the written “Notice to Proceed" and shall bring all Work to Substantial Completion on or before May 12, 2023. Final Completion shall be on or before May 26, 2023. Damages for delays in the performance of the Work shall be in accordance with Article 8.3.2 of the General Conditions of the Contract.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents