Similar Projects
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Katy Lakes Section 5
Post-Bid
TX

2021 Citywide Sanitary Sewer Line Rehabilitation
Post-Bid
Pasadena, TX

Water Distribution, Sanitary Sewer and Drainage Facilities to Serve Woodland Lakes Section 4
Results
TX

Enclave at Cypress Springs
Results
TX

North Hardy Commerce Park Waste and Wastewater
Post-Bid
Houston, TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Grease Trap Maintenance Services
Term Contract
Post-Bid
Baytown, TX

Proposed Water Distribution, Wastewater Collection, Paving & Storm Water Facilities to Serve Mandola Section One
Results
Less than $3,218,105 est. value
Houston, TX

Water, Sanitary, Sewer and Drainage Facilities to Serve Katy Manor South Sections 3, 4 and 5
Post-Bid
Cypress, TX

Water Distribution Sanitary Sewer and Drainage Facilities to Serve Telge Ranch Section 4
Results
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Rose Meadows Farms Section 4
Post-Bid
Houston, TX

Phase 2020A Sanitary Sewer Rehabilitation to Serve North Belt Utility District
Results
Less than $472,747 est. value
Houston, TX 77032

Sanitary Sewer Repair and Rehabilitation Project
Post-Bid
$150,000 to $200,000 est. value
TX

Water and Sanitary Facilities for Big John Street
Results
Less than $198,996 est. value
Spring, TX 77383

Elyson, Section Thirty Seven Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving
Post-Bid
TX

Reported 05/04/2022 12:00 AM
Project Title

Sanitary Sewer Phase 88 Manhole Rehabilitation

Physical Address View project details and contacts
City, State (County) Clear Lake City, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general, this work consists of: Cleaning and preparation of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, existing utility cables etc. Repair of sanitary sewer manholes including cementitious lining, repair of bench and invert, removing and replacing frame and cover, resetting and resealing frame and cover, raising sanitary sewer manholes, grouting exterior of manhole frames, removing and relocating pipe and/or cable through sanitary sewer manholes, and repair of sanitary sewer manholes with epoxy materials. Contractor shall initiate coordination with pipe and/or cable owner within 30 days of notice to proceed and provide proof of ongoing communication throughout the project at a frequency of at least once every 30 days until completed. Bypass pumping, as directed by Engineer, to properly rehabilitate any manholes where a flow through bridge or plug is not a viable option. The cost for flow through bridges or plugs shall be included in other work items.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents