Similar Projects
Slope Repairs
Bidding
$1,300,000 est. value
Berea, OH 44017

Miscellaneous CSO Improvements
Bidding
Less than $2,150,000 est. value
Cleveland, OH 44115

Jacking and Boring Services
Term Contract
Post-Bid
Akron, Ashland, Bowling Green, Chillicothe, Delaware, Garfield Heights, Jacksontown, Lebanon, Lima, Marietta, New Philadelphia, OH

Lindbergh Boulevard (C.R. 276) Replacement of Existing Culvert C-00.93 Over a Creek to the West Branch
Post-Bid
Less than $600,000 est. value
Cleveland, OH 44115

Stickney Creek at Ridge Road - Stream Relocation and Utility Repair
Results
Cleveland, OH

Fabric Concrete Bag Reventment
Results

West Creek Bank Stabilization at Sandpiper Drive
Bidding
Less than $2,300,000 est. value
Parma, OH

Sewer Test Tee Inspection, Installing and Snaking
Term Contract
Post-Bid
Cleveland, OH 44114

Clifford Drive Sewer Replacement
Results
Less than $3,500,000 est. value
Fairview Park, OH

Precast Concrete Headwalls
Bidding

Bradley Road (CR 60) Culvert C-00.67 Replacement
Results
Less than $500,000 est. value
North Olmsted, OH 44070

W. 3rd Quigley/Westerly Miscellaneous CSO Control
Bidding
Less than $12,100,000 est. value
Cleveland, OH 44115

Wyatt Road Detention Basin
Results
Less than $494,313 est. value
Broadview Heights, OH

Columbia Road Culvert Replacement
Results
Less than $742,000 est. value
Bay Village, OH

Box Culverts
Results

Last Updated 05/02/2019 12:23 PM
Project Title

Nicky Boulevard Storm Sewer Extension and Slope Stabilization - Phase 1

Physical Address View project details and contacts
City, State (County) Cuyahoga Heights, OH   (Cuyahoga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,082,513
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents