Similar Projects
Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Bidding
$350,000 est. value
Tacoma, WA 98402

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Bidding
$2,300,000 est. value
Medina, WA 98039

Prequalifying Contractors for Construction Work for 2022
Infrastructure
Post-Bid
WA 98206

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Post-Bid
$705,000 to $790,000 est. value
Eatonville, WA 98328

Bellingham International Airport Replace Apron Lighting Project
Infrastructure
Results
Bellingham, WA 98225

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

Pierce County Three Sisters Radio Site - Generator Relocation and Contaminated Soil Cleanup
Alteration
Bidding
$350,000 est. value
Carbonado, WA 98323

MHR Residential Electrical
Alteration
Post-Bid
Puyallup, WA

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

WWTP Utility Water Building Improvements
New Construction, Alteration
Bidding
$250,000 to $300,000 est. value
Clarkston, WA 99403

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Electrical Construction Work Order 2021-2022
Term Contract, Alteration
Bidding
WA

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

WWTP Back-up 150 KW 120/240V Generator and Auto Transfer Switch
Alteration
Bidding
Tekoa, WA 99033

Reported 10/05/2021 11:30 AM
Project Title

Terminal Five North Reefer Infrastructure

Physical Address View project details and contacts
City, State (County) Seattle, WA 98106   (King County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $6,600,000 to $13,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will install Electrical Distribution System to power 1000 Refrigerated Container outlets rated at 3Phase, 30A, 480V each. This requires installing Medium Voltage Sectionalized Cabinets, Enclosed 2500-KVA Secondary Unit Substations and (4) Low Voltage Power Factor Correction Capacitors. This equipment will be connected to T5 Primary Substation utilizing electrical infrastructure installed under T5 Modernization project and additional new electrical infrastructure which include 1200 feet Medium Voltage Duct-bank, Electrical Manholes, Medium Voltage Feeder Cables, and all necessary support structures.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents