Similar Projects
Deloitte Expansion
New Construction, Addition - 49,000 SF
Conception
$4,014,000 est. value
Lake Mary, FL 32746

Goldchem Property Mixed-Use
New Construction
Design
Sanford, FL 32773

Fastenal Warehouse and Office
New Construction - 142,200 SF
Design
Sanford, FL 32773

Village Grande Climate-Controlled Storage
New Construction - 100,032 SF
Post-Bid
Altamonte Springs, FL 32714

Duke Energy North Point III Regional Headquarters - Phase 2
Renovation - 27,055 SF
Post-Bid
Lake Mary, FL 32746

1690 Fitzpatrick Point Warehouse Renovation
Renovation
Results
Less than $542,273 est. value
Sanford, FL 32771

County-Owned Property Redevelopment
Results
Altamonte Springs, FL 32701

Chris Johnson Warehouses
New Construction - 37,380 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Oviedo, FL 32762

Axios Mixed-Use Building
New Construction - 29,266 SF
Construction
$3,560,000 est. value
Casselberry, FL 32730

Smart Charging Technologies Office-Storage Building
New Construction - 14,349 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Oviedo, FL 32765

Vintage North Apartments
New Construction - 11,925 SF
Design
$58,900,000 est. value
Sanford, FL 32771

Seminole St. John Apartments
New Construction
Post-Bid
Sanford, FL 32771

Integra Crossings Master Plan
New Construction - 400,000 SF
Construction
Sanford, FL 32771

TMJ Warehouse and Office Building
New Construction - 11,248 SF
Design
Casselberry, FL 32708

IPG Oviedo Technology Center
New Construction - 50,000 SF
Construction
$2,000,000 est. value
Oviedo, FL 32765

Reported 06/07/2021 04:05 PM
Project Title

Marsden Office-Warehouse Building

Physical Address View project details and contacts
City, State (County) Fern Park, FL 32730   (Seminole County)
Category(s) Commercial
Sub-Category(s) Office, Warehouse/Storage
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

5,000 SF - Office, 1,600 SF New Construction, 1 Warehouse/Storage, 1 Story Above Grade, 3,400 SF New Construction 4 Unit(s), New Construction, 12 Parking Spaces, 0.47 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents