Similar Projects
Mountain View Correctional Facility - Gymnasium Roof Replacement
Alteration
Bidding
Less than $80,000 est. value
Charleston, ME 04422

New Roof
Alteration
Bidding
North Anson, ME

Partial Roof Replacement for Pembroke Elementary School
Post-Bid
Eastport, ME 04631

Music Camp Dba Snow Pond Center Renovation - Pavers
Addition - 3,600 SF
Post-Bid
$40,000 est. value
Sidney, ME 04330

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Installation of Metal Roofing
Post-Bid
Fort Fairfield, ME 04742

Readfield Public Library Roof Replacement and Fire Station Expansion
Addition
Results
Readfield, ME

Roof Replacement - The Fort Kent Knights of Columbus
Post-Bid
Fort Kent, ME

Design/Build of Sheds and Roofs at Public Works Facility
Results
New Gloucester, ME 04260

Flanagan Recreation Center Roof Replacement/Repairs
Post-Bid
Rockland, ME 04841

Portland Exposition Building Roof Replacement
Results
Less than $200,000 est. value
Portland, ME 04102

Roofing MACC
Post-Bid

6/16 Central Roof Replacement
Results
Bangor, ME 04401

Silo Observatory Roof/Wall Replacement
Post-Bid
Levant, ME 04419

Last Updated 06/09/2021 09:08 AM
Project Title

CATC Firefighting Building Project

Physical Address View project details and contacts
City, State (County) Augusta, ME 04330   (Kennebec County)
Category(s) Single Trades
Sub-Category(s) Concrete, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $63,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Augusta School Department is requesting a proposal for a new foundation roughly 52’ X 42’ and 6” thick consisting of 4000 psi concrete with, 2’ grid of #4 rebar through the entire slab and 3’ inches up from bottom of 16” haunch. 2” of insulation underneath the pad and under haunch and on sides. The ground work should consist of 24” of 2” gravel with 500X fabric. Engineered plans will be needed for the installation of the provided metal roof that will be fastened to two 40’ storage containers that are on site. Alternate BID’s for a new metal building will also be accepted. Installation of the cement pad and structure must be completed before June 25, 2021.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents