Similar Projects
Caribbean Restaurant
New Construction
Conception
Brockton, MA 02302

Atlantic Mechanical Warehouse
Addition - 10,000 SF
Conception
Brockton, MA 02301

Residences At Driftway Place
New Construction
Design
Scituate, MA 02066

Mary Lane Mixed Use Storage and Office Buildings
New Construction - 37,500 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Plymouth, MA

Two (2) New Sheet Metal Three (3) Sided Buildings for the Highway Department
Post-Bid
$50,000 est. value
Lakeville, MA 02347

Renovation and Leasing of the Pickling Building
Renovation
Post-Bid
Wareham, MA 02571

Materials and Construction of a 14’ X 18’ Utility Building
New Construction
Results
Less than $20,000 est. value
Duxbury, MA

Scheduled and Emergency Salt Shed Repairs and Improvements at Various Locations
Results
Less than $450,000 est. value

Marion Drive Commercial Building
New Construction - 24,000 SF
Construction
Kingston, MA 02364

Dunkin' Donuts
New Construction - 2,070 SF
Construction
$500,000 to $1,000,000 CJ est. value
Hingham, MA

Field Street Restaurant Expansion
Renovation
Pending Verification
Less than $250,000 est. value
Brockton, MA

Jordan Brothers Seafood Packing House
Renovation
Pending Verification
Brockton, MA 02301

Nutrition Club
Renovation
Conception
Less than $13,700 est. value
Brockton, MA 02301

Natalie Way Storage - Store - U - Self
Renovation
Design
Plymouth, MA 02360

Mixed Use Development Opportunity within the Downtown Trout Brook Redevelopment District
New Construction
Post-Bid
Brockton, MA 02301

Reported 07/08/2020 12:50 PM
Project Title

Weathervane Golf Academy - Tavern, Workout Facility and Storage

Physical Address View project details and contacts
City, State (County) Hingham, MA 02043   (Plymouth County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Food/Beverage Service, Warehouse/Storage
Contracting Method Qualified Bidding.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, 1 Food/Beverage Service, 2 to 3 Stories Above Grade, 12,000 SF New Construction, Warehouse/Storage.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents