Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

New Department of Public Works and Office of the Sheriff Grove Avenue Facility
New Construction
Bidding
NJ

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Y--VISN 2 DOWNSTATE NY/NJ MATOC IDIQ
Post-Bid
$2,000 to $10,000,000 est. value
East Orange, Lyons, NJ - Castle Point, Montrose, NY

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Post-Bid
Less than $95,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Y1da--Improve Site IT
Design
$2,000,000 to $5,000,000 est. value
East Orange, NJ 07018

Design Build Multiple Award Task Order Contract
New Construction
Post-Bid
$500,000 to $10,000,000 est. value

Job Order Contracts (JOC) Region B
New Construction, Renovation
Results
$10,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Fieldhouse Building at Lions Gate Park - Phase II B
Results
Bloomfield, NJ 07003

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Last Updated 02/28/2020 08:46 AM
Project Title

Collins House Historic Restoration Phase V

Physical Address View project details and contacts
City, State (County) Bloomfield, NJ 07003   (Essex County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $337,560
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the abatement of existing asbestos flooring from the second floor, minor historic stone masonry foundation repair, the installation of a poured concrete slab floor in part of the existing cellar, the installation of five (5) new cellar windows, the installation of two (2) additional first floor exterior doors, the installation of three (3) additional first floor windows with historic storm windows, the framing of a new front and side landing with steps to grade, the framing of a new wood bulkhead door enclosure atop the existing masonry cheek walls, the installation of exterior trim around the new openings, the removal of the first floor mothballing around the fireplaces with restoration procedures coordinated with the Architect in field, historic paint analysis for interiors. The replacement of the interior basement stair, the replacement of the staircases leading from the first floor to an intermediate landing and from the intermediate landing to the second floor (the intermediate landing shall remain), the replacement of the staircase from the second floor to the loft, structural repairs / reinforcement to floor and ceiling framing assemblies as noted in the plans, the rough framing of interior walls / partitions on the first and second floor, rough HVAC, rough plumbing, rough electrical, restoration of site utilities and meters (gas, water, electric, sewer, telecommunications), the installation of exterior shutters, and the exterior painting of new components.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents