Similar Projects
40th-San Pablo Transit Hub and 40th Street Reconstruction - City of Emeryville
Infrastructure
Conception
$10,787,000 est. value
Emeryville, CA 94608

Castro Valley Boulevard Corridor Improvements from San Miguel Avenue to Stanton Avenue - Alameda County
Infrastructure
Conception
$1,250,000 est. value
Castro Valley, CA 94546

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Apply High Friction Surface Treatment
Infrastructure
Design
$3,502,000 est. value
Sunol, CA

Oakland LSR Paving Program
Infrastructure
Bidding
$5,200,000 est. value
Oakland, CA 94622

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Sunol Ridge Roadway Reinforcement - Alameda County
Alteration
Conception
$1,000,000 est. value
Castro Valley, CA 94552

Pavement Preservation
Infrastructure
Design
$70,622,000 est. value
Hayward, CA 94545

Airport Pavement
Infrastructure
Post-Bid
Hayward, CA 94541

Citywide Pavement Rehabilitation 2021
Infrastructure
Results
$13,486,600 est. value
Oakland, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Citywide Pavement Rehabilitation
Infrastructure
Results
$13,486,600 est. value
Oakland, CA

Last Updated 07/07/2022 12:47 AM
Project Title

2022 Pavement Management Project

Physical Address View project details and contacts
City, State (County) Alameda, CA   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with pavement seal coats, hot mix asphalt inlays, full depth reclamation (FDR), crack seal, drainage improvements, and pavement delineation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents