Similar Projects
Bridge Creek Residential Development / Prattville
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Prattville, AL 36067

Sidewalk Improvements Along Doster Road
Infrastructure
Bidding
$450,000 CJ est. value
Prattville, AL 36067

Sidewalk Improvements Along Doster Road
Infrastructure
Bidding
$450,000 CJ est. value
Prattville, AL 36067

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Autauga County EMA Storage Building
New Construction, Infrastructure - 2,732 SF
Post-Bid
$150,000 CJ est. value
Prattville, AL 36066

Constructing the Resurfacing (Micro-Surfacing Seal Coat, Type III), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe on SR-6 (US-82) from the Chilton County Line to 0.800 mile west of the Junction of CR-40
Infrastructure
Results
$2,844,924 to $3,477,129 est. value
AL

Widening, Resurfacing, and Traffic Stripe on CR-27
Infrastructure
Results
$1,075,848 CJ est. value
Prattville, AL 36067

Park Lane Residential Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Prattville, AL 36067

Glennbrooke Residential Development - Phase 7 / Prattville
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Prattville, AL 36067

Pratt Park Improvements
Infrastructure, Renovation
Post-Bid
$400,000 CJ est. value
Prattville, AL 36067

Autauga County Sewer Authority Waste Water Treatment Plant and Pump Station No. 1
New Construction, Infrastructure
Results
$4,685,000 CJ est. value
Prattville, AL 36067

McClain Landing North Residential Development / Prattville
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Prattville, AL 36067

USDA Funded Sewer Improvements
Renovation, Infrastructure
Post-Bid
$959,956 CJ est. value
Autaugaville, AL 36003

Russell Do It Center and Cone Street Sewer Repairs
Infrastructure
Post-Bid
$525,000 CJ est. value
Prattville, AL 36067

Prattville Early Learning Center for the Autauga County Board Of Education
New Construction, Infrastructure - 85,685 SF
Post-Bid
$32,000,000 CJ est. value
Prattville, AL 36066

Last Updated 08/23/2023 04:31 AM
Project Title

Constructing the Planing, Resurfacing, and Traffic Stripe on Doster Road

Physical Address View project details and contacts
City, State (County) Prattville, AL 36067   (Autauga County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,140,806 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Autauga County Contract Time: 40 Working Days For Constructing the Planing, Resurfacing, and Traffic Stripe on Doster Road From the Junction Of Fleetwood Road to the Intersection of Sr-3 (Us-31) in Prattville (Site 1) and the Resurfacing and Traffic Stripe on Lower Kingston Road From the Junction of 4th Street to the Junction of Cr-85 (Breakfast Creek Road) in Prattville (Site 2). Length 4.306 Mi. The Bracket Estimate on this project is from $933,387 to $1,140,806 . If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 021 - Constructing the Planing, Resurfacing, and Traffic Stripe on Doster Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents