Similar Projects
New Sheriff Office Building
New Construction - 6,968 SF
Post-Bid
Fulton, MS

City of Senatobia - Police Station Renovation
Renovation - 6,628 SF
Results
$663,834 est. value
Senatobia, MS 38668

Basin Volunteer Fire Department Hurricane Zeta Remediation Work
New Construction - 2,360 SF
Post-Bid
Lucedale, MS 39452

Facility Improvements for Magnolia Police and Fire Station
Renovation
Post-Bid
Magnolia, MS 39652

Addition and Alterations to Fire Station Building 2090
Addition
Post-Bid
Camp Shelby, MS

Fire Station 3 Renovations and Repairs
Renovation
Results
$62,256 est. value
Starkville, MS 39759

Lamar County Fire Training Facility and EMA Dry Storage Warehouse
New Construction
Results
Purvis, MS

New Sheriff Building & Detention Center Improvements
New Construction, Renovation
Design
Oxford, MS

Last Updated 01/05/2022 10:11 AM
Project Title

City of Collins - Police Station Addition and Renovation

Physical Address View project details and contacts
City, State (County) Collins, MS   (Covington County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the following items: 1.Addition to existing Police Station 2.Partial interior renovations to existing Police Station.

Details

Fire/Police Station, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Acoustic Treatment, Painting and Coating, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents