Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

The Chapel In Marlboro
Renovation - 8,000 SF
Design
Louisville, OH 44641

Collection System Repairs Phase II
Infrastructure
Bidding
$7,040,000 CJ est. value
Canton, OH 44702

Park Drive Phase 1
Infrastructure
Bidding
$200,000 est. value
Brewster, OH 44613

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

2021 Resurfacing and Drainage Improvements
Post-Bid
$192,200 est. value
Canton, OH

Two Lane Resurfacing - SR 687-00.91
Results
OH

H-1-2021 Chip Seal Resurfacing Project
Results
$817,890 est. value
OH

Clay's Park Resort
New Construction, Alteration - 1,050 SF
Pending Verification
Less than $500,000 CJ est. value
North Lawrence, OH 44666

Fairhope Properties
New Construction, Alteration - 4,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Louisville, OH 44641

Two Lane Resurfacing - SR 43
Infrastructure
Bidding
$2,355,000 est. value
Canton, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Crack Sealing - CS FY2021
Results

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

Demolition of House and Garage
Term Contract, Demolition, Infrastructure
Bidding
$290,000 CJ est. value
Limaville, OH 44640

Last Updated 07/28/2022 12:04 PM
Project Title

Canal Fulton Baptist Church

Physical Address View project details and contacts
City, State (County) Louisville, OH 44641   (Stark County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Paving/Reconstruction, Religious Facility, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new building. As of July 27, 2022, this project is in the process of getting approvals. Information regarding an architect and general contractor has not yet been confirmed. A firm timeline for construction has not been confirmed, but estimated to begin fourth quarter 2022, at the earliest. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

676 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents