Last Updated 03/06/2020 12:39 PM
Project Title

Shawnee Trail Lift Station 1 Improvements

Physical Address View project details and contacts
City, State (County) Celina, TX   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $114,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installing two submersible grinder pumps, one replacement pump control panel, approximately 25 LF of 3” sanitary sewer force main, approximately 10 SY of reinforced concrete lift station pad, reinforced concrete retaining wall, one 36” diameter fiberglass valve vault with a depth at least 4’ - 6”, two pairs of 3” check and gate valves, two 36” aluminum covers with hatch doors, and security fencing.

Details

Division 03 - Concrete.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Common Work Results for Utilities, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents