Similar Projects
#1,#3 and # 2 Oostanaula Raw Water Pump Rebuild - City of Rome
Infrastructure
Conception
$300,000 CJ est. value
Rome, GA 30161

Gibbons Street Multi Residential
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Rome, GA 30161

Driveway Improvements for Model Elementary, Middle, and High School
Infrastructure
Design
$750,000 CJ est. value
Rome, GA 30161

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Site Improvements for Rome Fire Department Burn Building
Post-Bid
Rome, GA

2021 LMIG Project
Results
Mount Vernon, GA

8.092 Miles of Milling, Inlay and Plant Mix Resurfacing on Us 27/SR 1 Loop Beginning North of SR 1 and Extending North of Sr 156
Results
GA

SR 20 From SR 100 to SR 1
Infrastructure
Design
$7,000,000 est. value
Rome, GA 30149

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

6.653 Miles of Milling, Inlay and Plant Mix Resurfacing on US 411/SR 20 Beginning West of Chateau DR and Extending to the Bartow County Line
Infrastructure
Results

SR 293 at Dykes Creek 5.4 Mi E of Rome
Infrastructure
Design
$6,000,000 est. value
Rome, GA 30149

The Varsity / Rome
New Construction, Infrastructure - 4,449 SF
Post-Bid
$2,250,000 CJ est. value
Rome, GA 30161

East 14th Street Roadway Improvements
Infrastructure
Results
Rome, GA 30161

SR 20 From SR 100 to SR 1
Infrastructure
Design
$7,000,000 CJ est. value
Rome, GA 30165

Concrete and Portland Cement Concrete (PCC) Pavement Rehabilitation Services
Infrastructure
Post-Bid
$400,000 CJ est. value
Rome, GA 30161

Last Updated 08/19/2022 03:02 PM
Project Title

Turner McCall Boulevard Bridge - Georgia Department of Transportation

Physical Address View project details and contacts
City, State (County) Rome, GA 30161   (Floyd County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected August 2026
Bids Due View project details and contacts
Estimated Value $28,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the Turner McCall Boulevard bridge over the Etowah River. The replacement bridge is now being designed as a seven-lane bridge, with a middle turn lane. As of August 19, 2022, information regarding a design team is not available. Construction is anticipated to begin in 2026. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents