Similar Projects
Breed - Townsend, Parkway Drive - CTH W
Infrastructure
Post-Bid
$2,000,000 to $2,999,999 est. value
Breed, Townsend, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Flatley Avenue Reconstruction
Results
$605,000 est. value
Oconto Falls, WI

2021 Harbor Road and Splinter Causeway Reconstruction
Results
$2,250,000 est. value
Oconto, WI 54153

T. Underhill, CTH R, Shawano County Line - CTH VV
Results
WI

2021 Splinter Causeway Reconstruction
Results
$1 to $300,000 est. value
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Pulaski - STH 22, Pulaski NVL - CTH E; Pulaski - STH 22, CTH E - STH 22
Results
Pulaski, WI

2021 Cross Road Improvements
Infrastructure
Results
Sobieski, WI

Epoxy Pavement Markings - STH/USH, Locations on STN Per Annual Plan
Infrastructure
Results

T. Stiles, CTH I, Husky Lane to Fuller Lane
Infrastructure
Results
WI

T. Spruce, CTH B, CTH M - CTH G
Infrastructure
Results
WI

Gillett - Mountain, Trinity Church Road - CTH AA; Suring - Breed, South Branch Oconto River Bridge
Infrastructure
Results
WI

Last Updated 04/25/2022 08:11 AM
Project Title

Jones Avenue Urban Design

Physical Address View project details and contacts
City, State (County) Oconto, WI 54153   (Oconto County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of approximately 1,110 LF of water main relay, 8,500 CY of excavation, 7,500 CY of base course, 4,800 LF of curb and gutter and 2,600 tons of asphaltic pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents