Similar Projects
Wilson Park Improvements
Renovation
Conception
$3,050,000 est. value
Chicago, IL

Ballard Farm Single Family Homes
New Construction
Design
Plainfield, IL 60544

Encuentro Square- Phase II
New Construction
Design
$47,500,000 est. value
Chicago, IL 60677

Inter-American Elementary School Playground Surface Various Trades
Renovation
Bidding
$175,000 est. value
Chicago, IL 60613

Shepard Park 2022 Improvements
Renovation
Bidding
$130,000 est. value
Deerfield, IL 60015

Presidents Playground Equipment
Post-Bid
Wheaton, IL

Lions Stadium Inclusive Playground
New Construction
Post-Bid
Less than $200,000 est. value
Lansing, IL 60438

Manual High School Tennis Courts Improvements
Results
Peoria, IL 61605

2021 Playground and Skate Park Replacement Phase 1
Results
Less than $230,000 est. value
Lake in the Hills, IL

The Oak Brook Commons Mixed Use
New Construction
Construction
$500,000,000 est. value
Oak Brook, IL 60523

KLA School
New Construction, Build-Out - 21,824 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Naperville, IL 60564

Midwest Industrial - Village of Libertyville
Addition, Build-Out - 480,580 SF
Pending Verification
Libertyville, IL 60048

Clearwater Park Tennis Court Renovation Project
Renovation
Bidding
$480,000 est. value
Mount Prospect, IL 60056

North Park Tennis/Pickelball Court
Post-Bid
Lincolnshire, IL

Maple Park
Results
Palatine, IL

Reported 05/27/2022 12:00 AM
Project Title

D/B - Together We Play - Accessible Playground Project

Physical Address View project details and contacts
City, State (County) Peoria Heights, IL 61616   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of two parts: (1) design of playground equipment, and (2) furnishing and installation of new playground equipment, fixtures and surface materials. All questions shall be directed to Wayne Aldrich at waldrich@f-w.com and received no later than May 19, 2022 at 5:00pm. All questions shall be promptly answered by issuing addenda. Proposers must be experienced in the design and installation of playground equipment of the type identified in the Project Documents. Compliance with the Employment of Illinois Workers on Public Works Act (30 ILCS 570/0.01 et seq.) and the Illinois Prevailing Wage Act (820 ILCS 130/0.01 et seq.) will be required for this Contract. The Village of Peoria Heights reserves the right to reject any and all proposals or to waive any informalities in proposals, should the Village of Peoria Heights deem it to be in the public interest to do so. This selection will be based on the Best Value to the Village and its partners. Proposals will be selected not only by price, but also by thoroughness of proposal, timeline, quality of service, past experience with installation of the same products, quality of equipment, services offered and warranties, as judged solely by the Village of Peoria Heights.

Details

Park/Playground, Renovation.
Division 01 - General Requirements, Quality Requirements, Regulatory Requirements, Fees.
Division 11 - Equipment, Entertainment Equipment, Recreational Equipment, Play Field Equipment and Structures, Playground Equipment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Synthetic Resilient Surfacing, Playground Protective Surfacing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents