Similar Projects
Wharves 1- 4 Maintenance Dredging 2021 Project
Infrastructure
Results
$1,048,504 est. value
Redwood City, CA

Richmond Inner Harbor Maintenance Dredging
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Richmond, CA 94801

San Rafael Creek Maintenance Dredging Project
Term Contract
Post-Bid
$4,000,000 to $8,000,000 est. value
CA

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Oceanside Harbor Maintenance Dredging
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Oceanside, CA 92054

Last Updated 12/20/2021 11:45 AM
Project Title

Ventura Harbor Maintenance Dredging

Physical Address View project details and contacts
City, State (County) Ventura, CA 93001   (Ventura County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $20,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Ventura Maintenance Dredging: The annual maintenance dredging of Ventura Harbor results in the dredging of the federal navigation channel and sand trap, with placement of suitable dredge material on nearby downcoast South Beach, McGrath State Beach or in the nearshore (or both). Dredged material would not be placed in the mouth of the Santa Clara River or its estuary. Amount of dredging is dependent upon federal funding, which can vary for each dredge cycle. The typical range of quantity that is funded is 350,000 cubic yards to 750,000 cubic yards per dredge cycle. The proposed 3 year Ventura Maintenance Dredging contract contains a base dredging period (1st cycle) and two option periods (2nd and 3rd cycles), with a completion time of approximately 60 days per dredge cycle. The contractor needs to have the capacity to dredge approximately 20,000 cubic yards per day. The first cycle dredging of Ventura Harbor is scheduled to occur in Winter 2021.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents