Similar Projects
1'6" Hydrant and Accessories
Infrastructure
Bidding
College Station, TX

Fire Hydrant and Accessories
Infrastructure
Bidding
College Station, TX

Midtown Reserve Subdivision Phase 106
Post-Bid
College Station, TX 77840

Midtown Reserve Subdivision Phase 107
Post-Bid
College Station, TX

Woodson Village Rehabilation
Results
$5,055,913 est. value
College Station, TX 77842

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Southside Safety Improvements Projects
Results
College Station, TX 77840

Horticulture Forest Science Replace Hardware and ADA Upgrades
Infrastructure
Post-Bid
College Station, TX 77840

University Drive Pipe Burst Project
Results
College Station, TX 77845

Midtown City Center Phase 301 Replat
Infrastructure
Post-Bid
College Station, TX

Blanket Order for Pedestrian Crosswalk System
Term Contract
Results
$18,590 est. value
College Station, TX 77845

East 29th Street Traffic Signal Improvements: East 29th Street/Broadmoor Drive and East 29th Street/Carter Creek Parkway
Infrastructure
Post-Bid
$645,172 est. value
Bryan, TX 77808

Large Vacuum Valve
Results
College Station, TX 77845

Phillips Event Center Site-Civil
Infrastructure
Post-Bid
Bryan, TX 77802

Last Updated 12/21/2021 10:21 AM
Project Title

Krenek Tap Rehab

Physical Address View project details and contacts
City, State (County) College Station, TX 77840   (Brazos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,254,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified to perform the necessary evaluation, design, and related functions required for development of plans and specifications for the City of College Station. This project will include design and construction phase services to reconstruct Krenek Tap Road from Texas Ave to the southbound feeder road for state Highway 6. The design phase should include concrete pavement, sidewalks, wastewater lines, and traffic control.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents