Similar Projects
Last Updated | 12/15/2020 02:58 PM |
Project Title | Okeechobee Waterway, Reach 3 and 4 on the St. Lucie River Maintenance Dredging 8-Foot Project, Martin County, Florida |
Physical Address | View project details and contacts |
City, State (County) | FL (Martin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Jacksonville District of the US Army Corps of Engineers is seeking interested offerors for a project that consists of dredging shoal material from the Reaches 3 and 4 of the Okeechobee Waterway in Martin County, Florida to an 8-foot depth plus 1- foot allowable over depth. Dredged material will be placed in an existing Dredged Managed Material Area (DMMA), O-7, located approximately 9.0 miles from the eastern end of Reach 3. Other work includes clearing vegetation for the pipeline corridor. Incidental related work also includes turbidity monitoring, endangered species monitoring, and incidental related work. DESCRIPTION OF WORK: Project work consists of dredging shoal material from the Reaches 3 and 4 of the Okeechobee Waterway in Martin County, Florida to an 8-foot depth plus 1-foot allowable over depth. Dredged material will be placed in an existing Dredged Managed Material Area (DMMA) O-7, located approximately 9.0 miles from the eastern end of Reach 3. Other work includes clearing vegetation for the pipeline corridor. Incidental related work also includes turbidity monitoring, endangered species monitoring, and incidental related work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |