Similar Projects
Roofing MACC
Post-Bid

Roofing MACC
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing and Repairs
Term Contract
Post-Bid
Richmond, VA 23297

Roof on Stage at Chilhowie Recreation Park
Results
$6,350 est. value
Chilhowie, VA 24319

Z--Gutter Maintenance
Results
Bowling Green, VA 22427

Roof Replacement Project - Glen Forest Elementary School
Results
Falls Church, VA 22041

Roof and Partial HVAC Replacement - Great Bridge Intermediate School
Results
Less than $3,960,000 est. value
Chesapeake, VA 23322

Red Mill Elementary School Roof Replacement
Results
Virginia Beach, VA 23456

York High School Partial Roof Replacement and Coating
Results
$200,000 to $299,999 est. value
Yorktown, VA 23692

CCPS Five Roof Replacement Bundle
Renovation
Results
Chester, Chesterfield, Richmond, VA

Butts Road Primary School Roof Repair and Recovery
Alteration
Results
Chesapeake, VA 23322

Reported 09/08/2021 12:00 AM
Project Title

Roof Repair Services

Physical Address View project details and contacts
City, State (County) Woodford, VA 22580   (Caroline County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

USGS Fredericksburg (FRD) Magnetic Observatory FRD Coil Control Building Emergency Roof Repair: Roof of this building is aluminum lap-seam roofs with a wood 2X6 sub-layer. The roof suffered wind and rain damage in late July 2021. The wind stripped off the aluminum roofing and exposing the sub-layers to weather. The damage to the building was severe, in that the aluminum roofing was completely removed (Fig. 3). The quick fix for this situation was placing a temporary tarp-membrane over the sub-layer and tacking it down. Even so, there is possible rain damage to the sub-layers and possible mold and insulation issues.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents