Similar Projects
RFP - Third Party Fire Inspection Reporting Program
Term Contract
Conception
Salt Lake City, UT 84111

Newton Farms Park Improvement - City of West Valley City
Infrastructure
Conception
$625,000 CJ est. value
West Valley City, UT 84128

Olympia Hills
New Construction, Infrastructure
Design
$2,000,000,000 CJ est. value
Herriman, UT 84096

Chrome Works
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Salt Lake City, UT 84101

Mystic Springs Educational Wetlandcenter - Phase I
New Construction, Infrastructure
Bidding
$750,000 CJ est. value
South Jordan, UT 84095

Mystic Springs Educational Wetlandcenter - Phase I
New Construction, Infrastructure
Bidding
$750,000 CJ est. value
South Jordan, UT 84095

Bueno Avenue Apartments
New Construction, Infrastructure
Post-Bid
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

RFQ Contractor - 2021 UDOT Tie Fork Rest Area Landscaping Upgrades
Infrastructure
Results
$192,640 CJ est. value
Spanish Fork, UT 84660

Brix
New Construction, Infrastructure
Construction
$55,000,000 CJ est. value
Salt Lake City, UT 84101

HEDCO Renovation and Upgrade Room 130
Renovation
Construction
Salt Lake City, UT 84112

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

South Main Street Apartments / Salt Lake City
New Construction, Infrastructure - 8,400 SF
Pending Verification
$150,000,000 CJ est. value
Salt Lake City, UT 84101

Develop Maple Meadows II - City of West Valley City
Infrastructure
Conception
$2,800,000 CJ est. value
West Valley City, UT 84120

Last Updated 10/13/2023 06:33 AM
Project Title

Concrete Pads

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $49,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Quote to install two concrete slabs at the Water Shop, 3323 Sanborn Drive. The two pads are as follows: Haul Off Bin Pad: 16' x 75' size. Concrete is to be six bag mix, 10" thick, placed upon 95% compacted road base. Excavation of approximately 10" of existing soil, haul in and place road base and compact before pouring the concrete to keep the pad at the existing grade. Concrete Slab is to have an 18" x 18" #4 bar each way, tied together and overlapped at a minimum of 18" square. Bar is to be from edge to edge and shall be placed in the middle of the concrete. The pad shall be placed in one (1) continuous pour. Joints are to be 10' x 10' saw cut expansion joints and then filled with selfleveling non-expandable caulk. Contractor will be required to provide the city 48 hour notice before pouring. Questions of a technical nature regarding this project or the specifications should be directed to Craig Calvert at 801-208-3175. Wash Out Pad: 30' x 75' size. Concrete is to be six bag mix, 8" thick, placed upon 4" thick, 95% compacted, road base. Excavation of approximately 12" of existing soil, haul in and place road base and compact before pouring the concrete. The pad is to be level with, at most, a 1" lip so the pad's finished grade is equal to the surrounding existing grade. Concrete Slab is to have an 18" x 18" #4 bar each way, tied together and overlapped at a minimum of 18" square. Bar is to be from edge to edge and shall be placed in the middle of the concrete. The pad shall be placed in one (1) continuous pour. Control joints are to be 10' x 10' saw cut in joints filled with self-leveling non-expandable caulk. Contractor will be required to provide the city 48-hour notice before pouring. The City reserves the right to make an award based on overall low or based on individual pads, which ever is in the best interest of the City. The right is reserved to cancel this Request for Quotation or to accept or reject any or all quotes, and to waive any informality or technicality in any quote, in the interest of Riverton City. Contractor must be prepared, willing and accommodating to on-site inspection of all work, at any time, by a City representative, during job progress.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents